Traditional Culture Encyclopedia - Weather forecast - Emergency Plan for Cleaning and Snow Sweeping Safety
Emergency Plan for Cleaning and Snow Sweeping Safety
In our study, work and even life, we sometimes encounter unexpected accidents. In order to make emergency response in time and reduce the consequences of accidents, we often need to make emergency plans in advance. What are the characteristics of an excellent emergency plan? The following is the emergency plan (generally 5 items) for cleaning and snow sweeping that I have carefully compiled for your reference, hoping to help friends in need.
Emergency Plan for Cleaning and Snow Sweeping 1 It is applicable to the situation that when the school is near the end of school, it suddenly rains and snows, students don't bring rain gear, and a large number of parents gather at the school gate to meet students. (If it continues to rain and snow, parents and students are prepared to deal with it, and the school will implement the regular school opening arrangements. )
(1) Arrangement of parents' entrance and exit directions at the school gate
1. East Gate: All parents enter from the East Gate. After accepting students, parents can choose to take the east gate or the northwest gate according to their personal situation.
2. Northwest Gate: Only parents and students are allowed to leave the school gate, and parents are prohibited from entering the campus through this gate.
3. North Gate: When approaching the school, the north gate should be closed to prevent sudden rain and snow.
(B) the wrong schedule after class in each grade
1. The class teacher of each class organizes students in the classroom according to the broadcast arrangement of the brigade headquarters; Foreign students are not allowed to stay in school because of students' duty or individual counseling.
2. According to the arrangement of the wrong time of the school, the brigade department uses the broadcasting system to inform the relevant grades and parents to organize the school to leave school at different times.
Parents at the school gate should enter the teaching building to pick up students at different times according to the requirements of the school broadcast.
4. If parents are late, the class teacher should organize relevant students to wait in the classroom.
(3) Other precautions
1. Guide to the use of rain gear: In order to prevent students from being pricked by individual rain gear, parents are encouraged to equip their students with raincoats.
2. For students who use umbrellas, remind them to do the following three things: First, enter the teaching building to collect umbrellas; Second, when holding an umbrella, the tip of the umbrella should face down; Third, it is forbidden to play with rain gear
3. If it continues to rain and snow, parents and students are ready to deal with it, and the school will make regular school arrangements.
Emergency Plan for Cleaning and Snow Sweeping 2 In order to do a good job in dealing with disastrous weather such as freezing rain and snow in the city's education and sports system and ensure the personal life and property safety of teachers and students, this plan is formulated according to the Law of People's Republic of China (PRC) on Emergency Response, the Opinions of the People's Government of Hebei Province on Strengthening Emergency Management in an All-round Way (Zheng Ji 20x24) and the emergency plan of Botou Municipal Education and Sports Bureau, combined with the actual situation of our city.
I. Guiding ideology
Guided by the spirit of the 18th National Congress of the Communist Party of China, based on the national, provincial and municipal safety production laws, and aiming at ensuring the safety of teachers, students and employees' lives and property, we will actively take various preventive measures against freezing rain and snow disasters to ensure the smooth development of education and teaching in primary and secondary schools and kindergartens in the city in winter and spring.
Second, the working principle
Unified command, hierarchical management, overall linkage, put in place.
Three. Compilation basis and scope of application
This plan is formulated according to the Emergency Response Law of People's Republic of China (PRC) and the Opinions of Hebei Province and Cangzhou City on Strengthening Emergency Management, and is applicable to all primary and secondary schools and kindergartens in the city.
Fourth, organization
(1) Leading bodies
Botou City Education and Sports Bureau has set up a headquarters to prevent freezing rain and snow disasters.
Commander in Chief: Chen Lei.
Deputy commander: xx
Members: heads of various departments of the bureau, principals of primary and secondary schools, and kindergarten directors.
(2) Operation management organization
Set up the management office (security office) of Botou city education and sports system to prevent the disastrous weather of rain, snow and freezing, and be responsible for the business guidance, report and information communication of daily prevention of the disastrous weather of rain, snow and freezing.
Person in charge: Deng Yong
(3) Emergency measures
1.
(1) The main leaders of the Education and Sports Bureau are responsible for the overall work, and the leaders in charge specifically guide the implementation of primary and secondary schools and kindergartens.
(2) Members of the Education and Sports Bureau should pay special attention to the implementation of primary schools and kindergartens in the package.
(3) The principals or directors of primary and secondary schools and kindergartens are responsible for the implementation of the work of their own units.
2. Primary and secondary schools and kindergartens should promptly grasp and deal with the potential safety hazards caused by freezing rain and snow, including school buildings and other building facilities, carports, basketball stands, billboards, flagpoles, wires and other equipment and facilities, flowers and trees. Repair it in time if it is damaged.
3. Implement a daily disaster reporting system.
The office of the Education and Sports Bureau communicates with the higher authorities, competent departments and meteorological departments in time to understand and release early warning information. Primary and secondary schools and kindergarten offices have special personnel responsible for the transmission of telephone and network information. Once a disaster happens, it will be reported step by step in the shortest time, providing fast and effective support for command and decision-making.
(4) Early warning level
Snow disaster warning signals are divided into three levels, which are represented by yellow, orange and red respectively.
1, meaning of yellow warning signal: 12 hours, there may be rain, snow and freezing weather that has an impact on traffic.
2. The meaning of orange warning signal: there may be rain, snow and ice that have a great impact on traffic within 6 hours, or it has already appeared and may continue.
3. red warning signal Meaning: There may be snowfall that has a great impact on traffic within 2 hours, or there may be persistent heavy rain and snow freezing.
(5) Emergency response
1, generally (level 3), all primary and secondary schools and kindergartens report to the office of the Municipal Education and Sports Bureau, and according to the disaster situation, the top leaders and leading groups of all units implement emergency command work.
2, heavier (Grade II), all primary and secondary schools and kindergartens reported to the Municipal Education and Sports Bureau Office, and the headquarters of rain, snow and freezing disasters was personally commanded by the deputy director in charge of the headquarters, and the principals and directors of all units assisted in the implementation of emergency rescue work.
3. Serious (Grade I), all primary and secondary schools and kindergartens report to the snow disaster prevention headquarters of Botou Education and Sports System at the first time, which is under the unified command of the bad weather command of the Education and Sports Bureau to prevent rain, snow and freezing disasters, and the principals and kindergarten directors actively assist in emergency rescue work.
(6) Emergency treatment
1, all primary and secondary schools and kindergartens should make emergency plans for school safety in view of bad weather, and timely grasp the early warning information of rain and snow freezing. According to different levels of early warning signals, make correct judgments in time and inform parents of students through various means. With the consent of the Education and Sports Bureau, schools can adjust their schedules and take safety measures such as suspending classes, leaving school early, delaying school, informing parents to pick up and drop off, and escorting teachers.
2. In all primary and secondary schools and kindergartens, if the weather changes suddenly and the signal of disaster level is red, get in touch with parents in time, make a correct judgment at the first time and make adjustments in time with the weather changes. At the same time, report to the Municipal Education and Sports Bureau in the shortest time.
3. All primary and secondary schools and kindergartens should strengthen the management of picking up and dropping off students' vehicles, especially the investigation of road conditions before and after the arrival of bad weather to prevent traffic accidents.
4. After the freezing rain and snow weather, all primary and secondary schools and kindergartens should immediately carry out self-help and disaster reduction work, organize teaching staff to clean up the snow on campus in time, and ensure the smooth passage of students on campus. Warning signs should be set up in important parts of the campus, personnel in high-risk parts should be evacuated, closed with warning lines and protective nets, and guarded by special personnel when necessary to ensure foolproof. At the same time, it is necessary to carry out various forms of safety education activities to further improve the self-prevention awareness of teachers and students.
5. Strengthen the prevention of freezing rain and snow disasters. Take effective measures to prevent the roof, billboards and other facilities from being damaged.
Verb (abbreviation for verb) job requirements
1. Primary and secondary schools and kindergartens should strengthen the duty and security work during freezing rain and snow weather, so that someone is on duty 24 hours a day. The main leaders and leaders in charge of the unit should keep 24-hour communication open.
2. Do a good job in the investigation of potential safety hazards to prevent secondary or other safety accidents.
3. Strengthen the management of special vehicles for picking up and dropping off students to prevent traffic accidents.
4. Implement the accountability system. Leaders of all units should do a good job in the implementation of all work. If there are adverse consequences due to dereliction of duty or mismanagement, the Education and Sports Bureau and relevant departments will seriously investigate the administrative responsibility of the relevant personnel.
The implementation time of intransitive verbs in this plan
This plan shall be implemented as of the date of promulgation.
Emergency Plan for Cleaning and Snow Sweeping 3 In order to maintain the regional order of the North Railway Station Square, ensure the safe and smooth roads, improve the emergency ability to cope with bad weather, and minimize the losses caused by freezing rain, snow and ice disasters, this emergency plan is formulated in combination with the work responsibilities of various departments and units within the jurisdiction.
First, unify thinking and understanding.
It is necessary to do a good job in the safety management of the square area under the severe weather conditions of rain, snow and freezing as an important measure to prevent and reduce the occurrence of safety accidents in the North Railway Station, proceed from the overall situation, firmly establish the policy of "safety first, prevention first and comprehensive management", and conscientiously implement it in thought, measures and actions.
Second, strengthen organizational leadership.
In order to strengthen leadership and ensure the implementation of the work, a leading group for emergency management of disastrous weather such as rain, snow and freezing was established to be responsible for the decision-making and command of important matters in emergency management of disastrous weather such as rain, snow and freezing. The members of the leading group are: the director of the comprehensive management office as the team leader; Deputy director of the comprehensive management office and deputy head of the North Railway Station; The team members include the engineering section chief of Yuyao Section and Yuci Station Command of Passenger Dedicated Line, the comprehensive section chief, the management section chief, the deputy section chief of the comprehensive management office, the head of the police office of Tiepai Railway North Station, the deputy general managers and relevant responsible persons of all units in the jurisdiction, and the project manager of the property company.
The emergency management leading group office is specifically responsible for the emergency management of severe weather such as rain, snow and freezing in the square area; Coordinate and guide the emergency response work in areas affected by severe weather such as rain, snow and freezing, and coordinate relevant departments in the square area to jointly carry out emergency response work; Regularly summarize bad weather such as rain, snow and ice, passenger detention and road traffic information, and submit it to the leading group.
Third, clear job responsibilities.
Railway North Station: Formulate the emergency plan for bad weather in the unit and implement various safety measures; Responsible for maintaining the order of railway transportation, coordinating the comprehensive management office to properly arrange and evacuate passengers stranded in railway stations due to disasters; Implement rescue and relief materials to prevent rain, snow and freezing disasters; Responsible for coordinating railway safety management and emergency rescue work to ensure the safety and smoothness of railways.
Long-distance passenger transport companies, municipal public transport companies, urban and rural public transport companies, bus station companies and Cixi urban and rural public transport companies: make emergency plans for bad weather in their own units, implement various safety measures, arrange relevant personnel to be on duty at the station, and strengthen the dynamic management and supervision of passenger vehicles; Implement emergency rescue and relief materials to prevent rain, snow and freezing disasters, actively take measures to do a good job of snow removal and deicing in the station, and report the suspension of the class line and passenger transportation to the office of the emergency leading group and the higher authorities in a timely manner.
Comprehensive department of comprehensive management office: report the influence of bad weather such as rain, snow and freezing to the municipal party Committee and government in time; Prepare emergency support materials for severe weather such as rain, snow and freezing; Grasp the bad weather information such as rain, snow and freezing in real time; Strengthen the cadre duty system to ensure the smooth flow of information and government decrees; If the train is late, please contact the taxi company to ensure the ability to evacuate passengers in time.
Management Section of the General Management Office: according to the requirements of the superior, arrange personnel to complete the cleaning of the main roads in the area in time to ensure the smooth flow of the main sections and intersections in the square area; Timely understand and master the social security situation in the square area under bad weather such as rain, snow and freezing; According to the impact of bad weather such as rain, snow and freezing on traffic, issue early warning of bad weather traffic impact to passengers; Guide the comprehensive management team to focus on strengthening the patrol control of important nodes such as Zhanbei Road, taxi approach bridge and Zhannan Road to guide the safe and orderly passage of vehicles; Timely summarize bad weather such as rain, snow and freezing, passenger detention and road traffic information and submit it to the leading group.
Revitalize the property company: strengthen the inspection of facilities and equipment in the square area in bad weather such as rain, snow and freezing, and ensure the normal operation of the underground garage; Implement the standby of security personnel and prepare all kinds of materials and equipment needed to deal with bad weather such as rain, snow and freezing; Obey the arrangement of the management section and organize personnel to carry out road snow removal work in time.
Fourth, arrange stranded passengers.
Affected by bad weather such as rain, snow and freezing, trains are often delayed and passengers are stranded. Therefore, it is necessary to provide accurate train information, actively organize and coordinate relevant departments to evacuate passengers in an orderly manner, and properly arrange stranded passengers.
(1) The General Department contacted the North Station to find out about the train delay (train number, passenger flow, etc.). ) contact the taxi company in time to ensure the transportation capacity to evacuate passengers in time; Contact the surrounding hotels to provide accommodation information for passengers.
(2) If there are indeed stranded passengers, organize forces to guide the stranded passengers to rest in the temporary resettlement sites (the first and second floors of the commercial building) in an orderly manner, contact the Civil Affairs Bureau, and provide necessary food, quilts and other insulation supplies. Contact the Municipal Health Bureau to start a temporary medical rescue station to provide necessary medical means for the prevention and control of infectious diseases. Property companies should do a good job in health management and public security.
Verb (abbreviation of verb) implementation requirements
(1) Strengthen leadership and attach great importance to it. Dealing with bad weather is a public welfare activity, which is directly related to the travel of the masses and the normal order of comprehensive management of the North Railway Station. All departments and units should attach great importance to it and make preparations in advance to ensure that personnel, materials and actions are in place. Disaster relief tools, snow melting and anti-freezing materials must be kept and maintained by special personnel to ensure emergency use and minimize possible losses caused by rain and snow disasters.
(2) Clear responsibilities and quick response. All departments and units should clarify the responsible person, ensure that communication tools such as walkie-talkies and mobile phones are unblocked, reach the designated place quickly, and carry out cleaning operations in time. It is necessary to further strengthen the duty work and implement the system of 24-hour duty and leadership. The personnel on duty should stick to their posts, pay close attention to the weather changes at any time, closely track the occurrence process of disasters, keep abreast of rain and snow, local conditions and disasters, and identify a liaison person to ensure the smooth flow of information. Once the disaster happens, it should be reported step by step according to the relevant information reporting system, and the emergency plan should be launched in time for proper disposal.
(3) Make demands and pay attention to methods. Pay attention to the ways and means to deal with bad weather, especially when sweeping snow and deicing, mainly manual cleaning. Snow removal should be cleared in time to ensure that the middle of the snow and the roads are clear when the snow stops. Snow removal should reach the standards of no leakage, no ice accumulation, no residual snow and the bottom of the road. We should attach importance to safety work, strengthen safety education for cadres and workers, and prevent accidents of vehicles and personnel.
Emergency Plan for Cleaning and Snow Sweeping Safety 4 I. Emergency Reporting Procedure
In order to do a good job in safety production under severe weather conditions such as rain, snow, fog and ice, a leading group is specially set up, with the top leader as the chief commander and the leaders in charge as the deputy chief commander. The members are composed of the stationmaster on duty and the heads of various departments, who are responsible for implementing the safety situation under severe weather conditions, arranging their own work, and implementing the responsibility system of "one post and two responsibilities". A special person is on duty all day (24 hours) and is not allowed to leave his post or leave his post in case of emergency. It is necessary to report to the higher authorities and relevant leaders at the first time, do this work well according to the instructions, and deal with the safety work under bad weather conditions such as rain, snow, fog and ice and whether the station is started to prevent road traffic accidents.
Second, the emergency command group
In order to do a good job in production safety under severe weather conditions such as rain, snow, fog and ice, prevent all kinds of accidents and do a good job in source management, an emergency leading group for production safety under severe weather conditions such as rain, snow, fog and ice is specially established:
Commander in Chief: Liang xx
Deputy commander: xxxx
Su Hongzhi Feng (Police Station)
Members: stationmaster on duty and heads of departments.
Everything is subject to the work arrangement of the commander-in-chief, with clear responsibilities and division of labor, and all departments should cooperate with each other to do emergency work. From the height of implementing Scientific Outlook on Development and promoting social harmony and stability, and in the spirit of being highly responsible for the safety of people's lives and property, we should attach great importance to the impact of bad weather such as rain, snow, fog and ice on road transportation. In case of bad weather, we should immediately start the plan, implement various preventive measures, ensure that work, personnel and measures are in place, do a good job in disaster prevention and relief, and ensure social harmony and stability.
Third, emergency measures.
Under bad weather conditions, do a good job in production safety in all parts and stations, overcome paralysis and luck, implement routine vehicle inspection, "three products" inspection, safety education, safety regular meeting, safety management system and various safety measures, increase the investigation of safety hazards, conduct self-examination and self-correction from the aspects of system, vehicles and personnel, do a good job in safety education, and improve the safety quality of employees. It is necessary to strengthen contact with meteorological, highway, traffic police and other departments, timely grasp meteorological and road conditions and other information, and do a good job in the interpretation, resettlement and evacuation of passengers. In view of bad weather, timely release all kinds of information, clarify responsibilities and put measures in place according to the requirements of various centralized management departments, especially do a good job in safety investigation during bad weather such as rain, snow, fog and ice, organize manpower to conduct safety inspection on all departments of the center to ensure foolproof, do a good job in safety publicity, and implement it according to the rules and regulations of the center to ensure the steady development of the center's safety work.
Fourth, the job requirements
Raise awareness and strengthen leadership. It is necessary to fully understand the extreme importance of safety work under bad weather conditions, enhance the sense of political responsibility and mission, proceed from the overall situation of maintaining the comprehensive, coordinated and sustainable development of the transportation industry, earnestly strengthen the leadership of preventive work, and ensure that all preventive measures are put in place.
Emergency Plan for Cleaning and Snow Sweeping Safety 5 In case of emergency (accident), this emergency plan is formulated in order to minimize the loss of environmental impact and occupational health and safety, and make necessary treatment and preparation for the next environmental improvement and comprehensive medical treatment.
This emergency plan is applicable to the emergency treatment of all projects under construction in winter rain and snow.
1. Compilation basis and principles
Code for Audit of Occupational Safety and Health Management System
Emergency preparedness and response control procedures
Implementation of project construction organization design
Adhere to the policy of "safety first, prevention first", "protecting personnel safety first, and protecting the environment first", and implement the principle of "always on standby, unified command, efficient coordination and continuous improvement".
2. Hazard analysis
Possible emergencies at the site include:
1. Mechanical damage caused by rain and snow
2. Rain and snow electric shock injury
3. Collapse accident (deep foundation pit and high slope excavation)
4. Traffic accidents in rain, snow and freezing weather
5. Rain and snow cover protection
3. Emergency preparedness
Emergency rescue team: responsible for formulating the emergency plan for this project, setting up a professional rescue team for this project, temporarily organizing rescue when an accident occurs, reporting the situation to the superior in time and requesting the support of the relevant departments at the superior.
On-site technicians and safety officers of the Engineering Department and the Security Department: responsible for on-site statistics, and report to the commander (captain) of the rescue team immediately after receiving the accident report.
Team leader: responsible for the command of emergency rescue of this project.
Deputy Team Leader: Assist the team leader to be responsible for the command of emergency rescue.
Engineering department: responsible for studying and formulating accident control measures, formulating emergency rescue measures and implementing them.
Material Equipment Department: ensure the material allocation and supply of equipment.
Office: responsible for organizing the rescue of the injured and escorting them to other hospitals, and mobilizing project personnel for on-site rescue. Responsible for external liaison and vehicle deployment.
Shelf team: responsible for on-site rescue and treatment. After on-site treatment, production will be resumed in time to ensure the smooth progress of construction production.
Emergency rescue professional team of the project department: the team members are jointly transferred by various departments. Including engineering rescue team, medical rescue team, communication support team, support team, material supply team, transportation team, etc. Their task is to:
Engineering rescue team: Personnel are dispatched from all work areas of the project to be responsible for emergency rescue and aftermath after the accident, so as to reduce risks, reduce accident losses and resume production.
Medical rescue team: led by the labor department of the project department, composed of several medical personnel from the construction site and other departments, responsible for the rescue and treatment of the wounded on site and the transport guarantee.
Communication support group: composed of technicians such as electricians in the work area, responsible for external communication support.
Security team: responsible for on-site security work.
Material supply group: responsible for emergency supplies.
Transport team: responsible for the transport of the wounded and the deployment of materials.
The rescue professional team conducts training and simulation drills.
The project department is responsible for the implementation of this emergency plan. The Project Department is responsible for supervising and inspecting the implementation of this emergency plan by each team, and other departments shall assist in the implementation of this emergency plan according to the division of responsibilities.
material preparation
4. Emergency response
When an accident occurs, the on-site personnel should take measures to control the spread or expansion of the situation and notify the emergency rescue team headquarters.
After receiving the notification report, the project department immediately launched the emergency preparedness plan, organized relevant personnel, equipment, materials, facilities and equipment, rushed to the scene, and took effective measures to rescue the wounded and property to prevent the situation from spreading and expanding. At the same time:
(1) Before the accident investigation team enters the site, assign special personnel to look after the site, and no one is allowed to move and take away the items on the site without authorization. When it is necessary to move some objects to rescue people and prevent the accident from expanding, it is necessary to make signs, draw accident scene maps, photos or videos, and explain in detail that cleaning up the accident scene must be approved by the accident investigation team.
(2) Immediately after the accident, report to the company, local safety production supervision bureau and relevant departments by fax or telephone.
(3) When the situation cannot be effectively controlled, under the unified command of the emergency rescue team, immediately rescue the relevant departments of the local government and evacuate if necessary.
5. Emergency measures and operating procedures
In rainy and snowy weather, the staff must carry out safety publicity and education before entering the site, remove the ice and snow on the road and keep the road clean. Take active emergency plans for the following unexpected accidents:
5. 1 Emergency Plan for Preventing Mechanical Injury in Winter Rain and Snow Weather
(1) Strengthen the regular inspection and maintenance of machinery and equipment, and eliminate hidden dangers of accidents in time.
(2) After the snowy day, check the mechanical equipment in time, clean up the snow and ice in time, and observe the system of stopping power supply and hanging warning signs.
(3) Further check before construction to ensure that the construction machinery is in good working condition before construction.
(4) In case of a mechanical injury accident, the on-site operator shall report to the project department of the company in time, and at the same time, according to the actual situation on site, the on-site emergency personnel shall arrive quickly to give preliminary treatment to the injured.
(5) In case of serious injury, call 120 emergency number, get in touch with the hospital in time, and send the injured to the hospital for treatment.
5.2 Emergency Plan for Preventing Electric Shock Injury in Winter Rain and Snow Weather
(1) Listen to the weather forecast in time and do a good job of rain and snow protection for the switch box at the accident site in advance. Unused equipment must be turned off before rain and snow.
(2) After the rain and snow, clear the snow and ice in time, and check whether the power supply and wires are damaged or leaked. If electrical equipment is found damaged, repair it in time to avoid electric shock.
(3) When someone gets an electric shock at the construction site, they should inform the electrician and emergency personnel in time, and rescue must be carried out under the condition of ensuring that the power supply is cut off, or the person who gets an electric shock is cut off with a dry wooden stick, and at the same time call 120 emergency number.
5.3 Collapse Emergency Plan
(1) After the rain and snow, clear the snow above the foundation trench and the square trench in time to prevent the foundation trench from collapsing due to excessive snow.
(2) When signs of collapse are found, the discoverer shall immediately call other personnel to evacuate the collapsed area in time.
(3) In case of collapse accident, immediately close the site to avoid secondary accidents. Immediately organize personnel to clean up the collapsed earthwork and reinforce the fragile parts of the soil.
(4) In case of personal injury, you should immediately contact the on-site emergency personnel for preliminary treatment of the injured, and call 120 emergency number.
5.4 traffic accident emergency plan
(1) If there is ice and snow on the road surface after snow, immediately organize construction personnel to clean up the accident road and clean up the important intersection sections. Ensure smooth construction roads, ensure social traffic safety and avoid social traffic accidents that affect engineering construction.
(2) According to the site conditions, arrange traffic guides to direct traffic at major intersections to prevent traffic accidents.
(3) After the snow, the manipulator of the equipment should be disclosed separately to prevent traffic accidents.
(4) In case of traffic accident, immediately organize traffic guidance personnel to resume traffic, so as not to affect the construction and social traffic.
(5) In case of personal injury, the first-aid personnel on site should immediately make preliminary treatment and send them to the hospital for further treatment.
5.5 overlay protection emergency plan
(1) Listen to the weather forecast in time. Before the snow falls, put away unnecessary equipment to prevent the snow from carrying heavy loads.
(2) Clean up the snow on the overlay in time after snow to prevent collapse.
(3) During the snow clearing, the construction personnel must do a good job in safety protection to avoid personal injury.
(4) If the overlay facilities are damaged, the construction personnel cannot enter the building, and the snow and damaged buildings should be cleared in time.
6. Emergency plan safeguard measures
6. 1. Strengthen duty and information communication. During the rainy, snowy and windy weather, it is necessary to implement a 24-hour duty system, smooth communication channels, timely understand and master the relevant situation, and report at any time.
6.2. Material support. The logistics support team should be responsible for the reserve of emergency materials, so as to be thoughtful, meticulous, timely and effective.
6.3. Technical support. Understand the weather situation in time and accurately, and prepare for rain and snow protection technology in time.
6.4. Publicity and education. Strengthen publicity and education for all construction personnel, and enhance workers' safety knowledge and self-protection awareness.
;
- Previous article:How does Dongguan Unicom open the weather forecast?
- Next article:Lotus in my hometown writes a composition (200 words)
- Related articles
- Is it still hot after beginning of autumn? Will it be hot after beginning of autumn?
- Planning of hospital charity activities
- Classification of meteorological radar
- Beautiful Hu Sha primary school excellent composition 400 words.
- Measures of Qingdao Municipality on the Administration of Safe Production of Marine Fisheries
- What are the famous supernatural phenomena in the world?
- The main deeds of excellent league branch secretaries
- Is it cold in Beibei, Chongqing in winter?
- Can mainlanders apply for credit cards in Hong Kong? If the credit card is overdue, the bank of Hong Kong will sue the credit card.
- The cause of redness under the nose