Specific process:
1. The traffic control station shall review the submitted application. If a village needs to establish a project, it must first verify whether the project is in the preparatory project library, and then declare it to the local township people's government and the traffic control station of the Transportation Bureau before the first half of the first year, and attach an application report, which should indicate the route direction, mileage and financing of the project and the basic situation of the declared road.
After the preliminary report of the township determines that the project needs to be declared in the second year of the township, the written report and village report of the application for project establishment will be summarized and reported to the traffic control station, and reported to the county rural highway construction office for upward declaration after being audited by the traffic control station. The statement should indicate the guarantee or preparation.
2, reported to the local county rural highway construction office. After receiving the report, the county people's government will organize the joint examination of the project according to the planning scale formulated by the city, the application report of each township, whether it is in the preparatory project library and the construction of village-level roads in each village, and sign the project planning opinions to the village.
3, the local people's government at the county level audit. After the project plan is issued, after the project is issued, the county rural highway construction office organizes special classes to verify the situation of each project from village to village, including route direction, mileage, subgrade situation, fund raising situation, planning situation, etc.
Then summarize the verification situation, and then the county people's government will organize relevant functional departments, mainly the Transportation Bureau, to carry out project approval, and then notify the traffic control station and towns in the form of documents in the name of the county people's government office.
4. After passing the inspection, the staff will start to work. After the project is issued, the villages are ready for construction, and when they are ready, they will apply to the traffic control station. The traffic control station staff will check the completion of subgrade.
If the route meets the requirements, the project village can only start with the commencement report (signed and sealed by the township, traffic control station and village committee), a copy of the construction contract, official seal and receipt to the county rural highway construction office to handle the supervision contract and other procedures (including data stamping, contract signing and material acquisition, etc.). ).
From June 20 18, the newly revised "Management Measures for Rural Highway Construction" was implemented. The Administrative Measures for Rural Highway Construction clearly stipulates that rural highway construction will still follow the principle of "county road construction and township road construction". Therefore, the main body of rural village roads and township roads is the "township people's government", and the township people's government should carry out rural village construction.
Extended data:
Application Report on Rural Highway Construction Project in XX Town and XX Village
XX Town People's Government:
XX Village is located in the southeast of XX Town, XX District, XXXkm away from the XX Town Government, and there are XXXX villagers in the area under its jurisdiction, which are inhabited by Han people. At present, the economy is mainly developed by planting rice, corn, cassava, aquatic plants, litchi, longan, fast-growing eucalyptus with sugar orange and breeding chickens, ducks and pigs.
In recent years, our village has made effective use of various natural conditions, responded to various national policies to benefit farmers, actively developed the rural economy, and made great progress in planting and aquaculture. But all the roads in my village are still loess roads. When it rains, it is muddy and the road conditions are extremely poor.
Due to the school merger in recent years, there is only one primary school in our village. Many children have to walk more than 3 kilometers to school. However, because of the bad road conditions, parents don't trust their children to go to school by bike, so most of them walk. Too long walking time may cause many unpredictable things on the way, which really worries parents.
In addition, with the development needs, many machines are unable or unwilling to enter the village, and agricultural products cannot be transported safely and quickly, which seriously hinders the development of rural construction.
Therefore, it is an urgent task to harden the road in our village.
In order to avoid potential safety hazards on children's way to school as much as possible, effectively solve the problem of children's difficulty in going to school, speed up the pace of poverty alleviation of residents in our village, and promote the rapid development of economic construction in our village, our village Committee decided to build XX-XX section of roads first after on-the-spot investigation of roads in our village (see annex: schematic diagram of road construction in XX village).
The total length of this section of highway is XXXkm, covering XXX production teams in two natural villages, XX and XX, with a direct beneficiary population of XXX and an indirect beneficiary population of more than XXX.
The construction of Mao subgrade began in XXX. Subgrade width XXm-XXm, average subgrade XXXm. It is necessary to build a bridge with Xm treaty or a drainage channel with XXX cubic meters of flow for flood control. The villagers responded enthusiastically to the fund-raising and it is now in full swing. Please give me hope for the project construction.
No, please indicate. XX village Committee XXX year XX month XX day
Baidu Encyclopedia-Project Proposal
- Related articles
- What clothes should I bring to Dalian on National Day this year? Urgent! ! !
- The unique style of our family composition 400
- Write a composition about "golden fields"
- Weather forecast for Hong Kong, Zhuhai and Macau from August 23rd to 28th!
- Csol, how to brighten the map? It is the brightest. Bifen
- What are the customs in early autumn?
- The latest news that the typhoon hit Shenyang and classes were suspended in many places in Liaoning.
- What is the first lesson of self-study in China Gardens?
- Is Cyprus a Middle Eastern country?
- Weather in Anfu, Ji 'an, Jiangxi