Transportation Contract 1 Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

Article 1: Project Overview

1, project name:

2, project contracting scope:

3. Project site

4. Commencement date: YY MM DD YY, subject to Party A's notice of entry.

Article 2: Quantity of Works

Tentative10000m3, subject to actual workload.

Article 3: Single transportation distance and unit price

1. Transportation distance: the spoil ground is within the range of 7.5 ~ 8km, and the unit price is 7.5 yuan /m3 (all unit prices exclude spoil fee, excavation and site leveling taxes). If Party A exceeds the transportation distance, additional compensation will be made, and the specific unit price will be negotiated separately.

2. Earthwork quantity is calculated above the vehicle.

Article 4: Specific acceptance methods of the project

1. The receipt record of the seal card shall be used as the basis for the settlement of quantities, but the acceptance sheet must be consistent with the record, and the vehicle load is insufficient to be subject to the acceptance record of the seal card. If the number of manual records does not match, and the reason cannot be found out, the number with less records shall be taken as the calculation number.

2. All vehicles entering Party B's site must be approved by Party A's metrological personnel. After the vehicle measurement is completed, Party B shall apply to the financial settlement team for a record card. Party B shall first install mud in the mud head of the construction site with a record card. Upon completion, the earthwork management personnel of Party A shall verify the vehicle capacity and sign the acceptance form. Party A unloads mud at the designated place, and the mud unloading driver submits the acceptance form to the management of Party A for confirmation. All mud trucks must obey the command of on-site management personnel, otherwise they will not be signed. Mud trucks without record cards signed by superior and subordinate managers will not be used as the basis for acceptance.

Article 5: Payment method of project funds

1. The settlement method of this project is three days. Party A shall settle the project according to the actual workload completed by Party B, and pay the project fee according to 100%.

2. Party A shall provide Party B with the fuel fee for the first entry of the motorcade, which shall be deducted when the project payment is settled for the first time.

Article 6: Responsibilities of both parties

1. Party A's responsibilities:

(1) Party A is responsible for handling all pre-construction procedures of the owner to ensure that Party B can enter the site on time.

(2) Be responsible for roads, urban management, traffic police and all expenses incurred due to exceeding the limit, so as to ensure the smooth traffic of Party B. Otherwise, Party A shall bear the lost time and compensate Party B according to the standard of RMB 65,438+0,000 per set per day. If Party B's vehicle license is incomplete, the responsibilities and expenses incurred have nothing to do with Party A..

(3) Be responsible for the housing expenses (water and electricity expenses shall be borne by Party B) and parking lot (including parking fees) of Party B's drivers and management personnel, coordinate all kinds of relationships and expenses between borrow yard and abandoned yard, ensure that the borrow yard and abandoned yard are used by Party B, and enable Party B to carry out construction smoothly on time and in quantity.

(4) Be responsible for paying Party B's project funds on time, so that Party B will not stop work.

(5) Be responsible for arranging and handling the loading machinery of the borrow yard and the leveling machinery of the garbage dump, so as to ensure that the transportation of Party B will not be affected. Otherwise, Party B shall be compensated for the lost time of 65,438+0,000 yuan per vehicle.

(6) Be responsible for compensating the entrance fee of 1000 yuan per vehicle, which will be deducted when Party A makes the first checkout. (7) If Party B's vehicles are running normally, but each tractor is less than 12 on average within 24 hours due to Party A's reasons, Party A will compensate Party B for the loss of 100 yuan for each tractor pulled less, otherwise, Party B will compensate Party A for 100 yuan.

(8) Under the condition that Party B does not violate this contract, Party A shall use Party B's vehicle for at least one month, otherwise, Party B shall be compensated for the round-trip loss of 5,000 yuan per vehicle, otherwise, Party B shall bear the same compensation liability.

(9) Under the condition that Party B's vehicle does not violate this contract and can meet Party A's construction requirements, Party A shall not arrange other vehicles to enter the site for construction, otherwise Party A shall compensate Party B for a loss of 300,000 yuan. On the contrary, Party A may arrange other vehicles to enter the site, and Party B shall not object.

2. Party B's responsibilities:

(1) After the contract is signed, Party B must organize the vehicles to enter the site according to the engineering requirements of Party A within the specified time, requiring the first batch of vehicles to be no less than 20 (the vehicles will enter the site within seven days). ), each car with a volume of more than 25m3 has a single front and two rear ends. Otherwise, Party A may terminate the Contract, and Party B shall compensate Party A for the loss of 300,000 yuan due to lost work.

(2) Vehicles organized by Party B must have complete licenses. If the vehicle is fined by the relevant administrative department due to incomplete license, it shall be borne by Party B, which has nothing to do with Party A. ..

(3) If a traffic accident occurs when Party B's motorcade is driving on the road, all economic and legal responsibilities shall be borne by Party B, not by Party A.. ..

(4) If Party B's motorcade leaves without reason within one week after entering the site, Party A will not settle the freight for the first three days.

(5) When the project is not completed or Party A violates this contract, Party B's vehicle shall not be transported out of the construction site without Party A's consent. If Party B unilaterally transfers the vehicle out of the construction site, Party A shall compensate for the loss according to the standard of 65,438 yuan+0,000 yuan per vehicle per day.

(6) Responsible for providing management personnel and logistics service personnel, ensuring 24-hour construction and not stopping work without reason. If found, compensate Party A for the loss of each set per day 1000 yuan.

(7) Responsible for the safety of vehicles and personnel to ensure safe and civilized construction. In case of safety accident, all economic and legal responsibilities shall be borne by Party B, which has nothing to do with Party A. ..

Article 7: Liability for breach of contract

1. If Party B's motorcade fails to work normally for three consecutive days or for more than five days in a month due to Party A, Party A shall compensate Party B for the lost time from the day after that, with a daily living allowance of RMB 1000 per vehicle and 50 yuan per person until the project is normal (except for natural disasters caused by force majeure).

2. If Party B fails to get on the bus on time, resulting in Party A's project not being completed on time or Party B stopping work for no reason, Party A has the right to order Party B to compensate Party A for the losses, and pay Party A 65,438+0,000 yuan per set per day during the overdue period, and has the right to expel Party B from the scene as appropriate.

3. Without the consent of the other party, Party A and Party B shall not terminate this contract. If one party breaches the contract, it will compensate the other party for all the losses.

Article 8. Others:

(1) Both parties shall cooperate with each other to solve and coordinate problems, and both parties shall designate special personnel to be responsible for site management.

(2) Both parties shall strictly abide by the terms of this contract, and neither party shall breach the contract. Otherwise, the breaching party shall bear all economic losses and legal responsibilities of the observant party and compensate the liquidated damages of 500,000 yuan.

(3) During the construction period, if a dispute arises between the two parties and cannot be resolved through consultation, either party may bring a lawsuit, and the expenses shall be borne by the breaching party.

(4) Matters not covered in this contract shall be supplemented and improved by both parties through consultation, and have the same legal effect as this contract.

(5) This contract is made in duplicate, each party holds one copy, and it will take effect after being signed by both parties.

(6) After the project completion price is settled, this contract will be terminated naturally.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2 Agreement on Excavation and Leveling of Earthwork in Transport Contract

Party A (Employer):

Party B (the transporter):

In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the specific conditions of this project, in order to clarify the rights, obligations and responsibilities of both parties to the project and ensure the comprehensive completion of the project tasks, the two parties signed this agreement through friendly negotiation on the principles of voluntariness, equality and mutual benefit, fairness and reasonableness, honesty and credibility, and mutual benefit. I hope both sides will abide by each other.

Article 1 General situation of the project

I. Project Location: Gaolan Port, Zhuhai City

2. Project scope: excavation, transportation and unloading of earth and stone.

3. Project quantity: about10 million square meters, and the construction period is tentatively set at one year.

4. Transportation distance and unit price of the project: within 4km from excavation to transportation dumping. Party B shall calculate the excavation and transportation price of each vehicle, and the after-tax price shall be charged by Party A to 7.8 yuan. Party A guarantees that Party B's motorcade will run smoothly on the highway. If the transportation route exceeds 0.5km after exceeding the contract 4 km, the extra freight will be calculated according to the average vehicle transportation price, and the single freight will increase accordingly with the field price.

Article 2 Project duration

According to the negotiation between both parties, after Party B approves the site and signs the contract, Party B will organize transportation tools and excavation tools within 3-5 working days from the date of Party A's notice of entry, and the project will be completed within 365 weather working days based on the commencement date of Party B's entry. In case of unforeseeable or force majeure, the construction period will be postponed.

Article 3 Settlement Methods and Payment Methods of Project Funds

1, machinery entrance fee, Party B is responsible for organizing excavators, vehicles and other machinery to arrive, and Party A is responsible for prepaying the towing fee.

Tractors are about 1, 000 ~ 1, 500 yuan, each 500 yuan.

2. Party B shall submit a transportation settlement form to Party A before 10 every morning, and use the mud and mud provided by Party A every time.

Based on the valid seal card or IC card, Party A shall settle 65,438+000% according to the actual number of cars loaded by Party B and the transportation distance. Party A will deduct 10 day's transportation fee for each vehicle in 200 yuan every day until a vehicle with a total amount of 20xx is deducted as the contract guarantee certificate, which will be fully refunded at the expiration of the contract.

3. The settlement time is the end of each day, and Party A will make transfer or cash settlement according to the bank account provided by Party B..

If Party A fails to pay Party B on time, Party B has the right to unilaterally stop work and recover the project payment from Party A, and may unilaterally terminate this agreement, requiring Party A to pay off the outstanding project payment, and requiring Party A to compensate Party B for the daily cost of each excavator of 65,438+0,000 yuan and the daily delay fee of each transport vehicle of 500 yuan until Party A pays off the project payment.

4. If Party B's vehicle is not driving illegally in the route designated by Party A and is detained by traffic police and road administration, Party A shall, within 24 hours.

Return the vehicle to Party B for use, otherwise, Party B shall compensate the detained vehicle in 500 yuan RMB every day.

Article 4 Responsibilities of Party A and Party B

(I) Party A's responsibilities

1. The representative appointed by Party A shall exercise the rights of Party A, be responsible for coordinating and communicating with Party B, and provide labor services when signing the contract.

Provide relevant information to Party B for backup.

2. Party A is responsible for handling the entry permit and fuel supply of the vehicles dug and transported by Party B (deducting the oil return fee after settlement), and sending supervisors.

Guide the on-site supervision and quality inspection of company personnel, and coordinate with Party B's towing team during the project implementation.

Communicate with Party B's on-site personnel and deal with various situations in time.

3, Party A is responsible for and timely organize acceptance and confirmation of Party B's engineering transportation volume and quantity, and go through the settlement procedures, such as Party A.

If Party A fails to provide Party B with reasonable transportation for this project, Party A must fully support all expenses incurred by Party B in dispatching vehicles for this project.

4. Party A shall pay the project settlement in time as agreed.

5. Party A is responsible for straightening out the surrounding relations and ensuring that Party B starts work for 2 1 hour every day under normal weather conditions, such as traffic,

Traffic police, municipal administration, environmental protection, forestry, village committees, neighborhood committees, land and urban management should ensure smooth roads, and Party A should be responsible for the expenses incurred when Party B's vehicles are not illegal.

(II) Party B's responsibilities

1. Party B shall organize dump trucks over 15-50 to enter the site with valid certificates within 5 days, with a capacity of 20 cubic meters and in good condition. Excavators control the actual demand of the construction site according to the number of vehicles of Party B, and back up the list of mechanical equipment and copies of three certificates of transport vehicles to Party A for review and filing, and rationally allocate vehicles and hooks according to the construction period.

2. Party B shall obey the production arrangement of Party A and ensure that the project is completed on time.

3. Party B arranges its own production personnel and manages its own production, and takes care of its own accommodation.

4. Party B is responsible for educating employees (including drivers) on construction safety technology and civilized construction. In case of any dispute with villagers, Party B shall notify Party A as soon as possible.

(1), implement the current civilized production and construction in China, Guangdong Province and Zhuhai City, strictly evaluate the standards, and abide by the safety rules and regulations formulated by Party A. ..

(2) Party B shall abide by the management regulations on production safety and current management laws and regulations in engineering construction, organize the construction in strict accordance with safety standards, accept the safety inspection of supervision at any time, and supervise and inspect the construction according to law. Take necessary safety protection measures to eliminate hidden dangers of accidents, and all responsibilities and expenses caused by improper safety measures of Party B shall be borne by Party B. ..

(3) Party B shall provide safety education and safety supervision to its site management personnel and production workers. Pay attention to safety during construction to ensure the safety of personnel and property. Party B must complete the project on schedule, and Party A has the right to refuse to pay the corresponding overdue project funds without Party A's consent.

(4) Party A provides accommodation for Party B's motorcade free of charge, and Party B is responsible for handling water and electricity expenses, meals and management.

Article 5 The term of this Agreement shall be from the date of the month to the date of the month.

Article 6 Matters not covered in this Agreement shall be signed by both parties through consultation in the spirit of friendly cooperation. The Supplementary Agreement and this Agreement have the following characteristics.

Equal legal effect.

Article 7 This Agreement is made in duplicate, each party holds one copy, which has the same legal effect. This agreement is strictly binding on both parties.

Abide by the execution.

Party A (official seal): Party B (official seal):

Representative of Party A: Representative of Party B:

ID card: ID card:

Date: Date:

Article 3 of the transportation contract Party A:

Party B:

With regard to the matter that Party A entrusts Party B to transport coal, the terms of the 20xx coal transportation contract signed by both parties through friendly negotiation are as follows:

I. Specification for transport vessels

Party B sends * * * * to transport Party A's coal.

Second, the entrusted business volume

Party A entrusts Party B to fully transport the coal put in the northern port, which is about 6.5438+0.4 million tons in the whole year.

Third, responsibility.

1. Party A shall provide safe ports and safe berths at the loading port and the unloading port, and provide sufficient goods according to the ship type.

2. Party B shall notify Party A of the ship's dynamics and position every day, and Party A shall notify all equipment maintenance plans in advance.

3. Any party who proposes to change or increase the loading and unloading port must obtain the consent of the other party.

Four. Transportation plan

1. Party A shall arrange the monthly transportation plan in a balanced manner within the contract year. Party A shall submit the transportation plan for next month to Party B before 25th of each month.

2. Party A shall notify Party B of the transportation plan for the next voyage three days before the unloading of each voyage. If there is any objection to the transportation plan, Party A shall be informed two days in advance, and both parties shall negotiate to modify it.

Verb (abbreviation for verb) measure and hand over.

1, the measurement is based on the draft of the ship in accordance with the Rules of Domestic Waterway Freight Transportation of the Ministry of Communications.

2. Party A shall not refuse to accept the goods at the unloading port because of the quality and quantity of the goods.

Intransitive verbs freight and demurrage

1. Freight rate consists of benchmark price and efficiency linkage adjustment price. The benchmark price remains unchanged during the contract period, and the linkage adjustment is determined according to the actual loading and unloading time.

2. Benchmark price: RMB * * * per ton from the north (Qinhuangdao, Tianjin, Huanghua, Jingtang and Jinzhou) to the ports in the Yangtze River.

3. The efficiency linkage adjustment is determined according to the voyage loading and unloading time of the ship. Total loading and unloading at two ports 144 hours. More than 60,000 yuan/day.

4. Actual loading and unloading time, loading port: counting from the time when the ship arrives at the anchorage designated by the loading port to the time when the handover formalities are completed after loading. If the ship directly docks, it shall be counted from the time of docking. Unloading: The ship shall be counted from its arrival at the unloading anchorage until the handover formalities are completed. Direct docking, counting from the time of docking.

Seven. Mobile berth

1. Party B's ship shall be loaded at the safe berth at the loading port at one time; Unloading shall be completed at the safe berth of Party A's owner's wharf. In the process of loading and unloading, if it is necessary to move the berth midway for reasons other than Party B's, Party B's consent shall be obtained.

2. Parking fee: Party A shall pay Party B a one-time fee of RMB 20,000 for each additional berth, from one berth to another, from one berth to another anchorage or from one anchorage to another.

Eight. solve

Party B will issue a formal water transport invoice to Party A immediately after the voyage cargo is unloaded, and Party A will pay the relevant expenses within half a month after receiving the official invoice from Party B..

Nine. insurance

Party A is responsible for cargo transportation insurance and Party B is responsible for ship insurance. If one party fails to take out insurance, the party who fails to take out insurance shall bear the full loss.

X. Dispute mediation

Any dispute arising from or related to this contract shall be settled by both parties through friendly negotiation. If negotiation fails, it shall be submitted to the maritime court where Party A is located for litigation.

XI。 Contract terms

1the voyage from 0: 00 on October 20th to 65438+ 1 at 24: 00 on February 20th.

Representative of Party A: Representative of Party B:

Date: Date:

Article 4 of the transportation contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _ _ _ _ Postal code: _ _ _ _ _ _ _ _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A) plans to deliver _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

1. Mode of transportation: Party B sends a ship (ship lifting equipment) with a tonnage of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Two. Concentration of goods: Party A shall concentrate _ _ _ goods at _ _ _ port within _ _ days according to the time specified by Party B. After the goods are collected, Party B shall send a ship for shipment within 5 days.

Three. Time of shipment: After Party A contacts the port of arrival and agrees to arrange unloading, Party B will confirm and prepare to take delivery (the opening date will be specified by Party B). The loading time is _ _ _ _ hours from the time when the ship arrives in Hong Kong and stops at the dock.

4. Delivery time: The ship will deliver the goods to the port of destination within _ _ _ hours after the loading and formalities are completed. Otherwise, bear the delay fee according to relevant regulations.

V sailing contact: after the ship is loaded and set sail, Party B will send a telegram to inform Party A to prepare for unloading. If pilotage is required, Party A shall also be informed to dispatch a pilot on time, and the expenses shall be borne by Party A..

6. Unloading time: Party A guarantees that Party B's ship will arrive at the anchorage of _ _ _ _ port within _ _ _ _ hours from the date of anchoring. Otherwise, Party A shall pay Party B the overdue payment of RMB _ _ _ _ _ _ _ _.

Seven. Transportation quality: When Party B loads the ship, Party A shall send someone to supervise the loading and guide the work to operate according to the regulations. After loading, the cabin shall be sealed, and Party A may send an escort (one free of charge) to accompany the ship. Party B shall guarantee the shipment by the original ship, and Party A shall be responsible for the quantity and quality of the delivered goods, except for the losses caused by the safety condition of the ship.

Eight, transportation costs: according to the provisions of the state, the first-class freight rate of water transportation is RMB _ _ _ _ _ _ _ _ _ _.

Nine. Expense settlement: After both parties sign this contract, Party A shall prepay transportation expenses to Party B.. After unloading the ship, Party B shall settle the account with Party A on the basis of the transportation fee voucher, and refund more and make up less.

X supplementary terms: each party holds one original and one copy. And registered with the Administration for Industry and Commerce. Matters not covered herein shall be handled in accordance with the Contract Law of People's Republic of China (PRC) and relevant state regulations.

Party A: _ _ _ _ _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 5 Name of Party A (employer) in the transportation contract:

Name of legal representative (principal responsible person):

Name of Party B (laborer): Gender:

Date of birth:

Address:

Contact information:

Resident identity card number:

According to the Labor Law of People's Republic of China (PRC), Labor Contract Law of People's Republic of China (PRC) and other laws and regulations, Party A and Party B sign this contract on the basis of equality, voluntariness and consensus.

I. Term of the Contract

Article 1 The term of this labor contract is years, starting from (year) to (year). The probation period is (months), from (years) to (years).

Second, the task

Article 2 Party B is responsible for driving brand cars.

Article 3 Party B shall take good care of the company's vehicles, pay attention to their daily maintenance, and regularly check the main parts of the vehicles. Conduct regular inspection and maintenance every week to maintain the life of machine parts and ensure driving safety.

Article 4 Party B shall clean the vehicles it drives every day and keep the vehicles clean (including the cleanliness inside, outside and engine).

Article 5 Before leaving the vehicle, it is necessary to routinely check whether the performance of water, electricity, oil, lights, braking system, tires and other parts of the vehicle are normal; If there is any abnormality, it should be supplemented or repaired immediately. When you come back from the car, you should check the oil reservoir. If you find that the oil storage capacity is less than one grid, you should refuel immediately.

Article 6 When Party B discovers that the vehicle it is driving is out of order, it shall immediately carry out overhaul. If it can't be repaired by itself, it should immediately report to the supervisor and put forward specific maintenance opinions (including maintenance items and roughly needed funds, etc.). ).

Article 7 Party B shall regularly check the validity of various certificates of the vehicles it drives, and ensure that the certificates are complete when the vehicles leave.

Third, working hours and rest and vacation.

Article 8 Due to the special nature of the work, Party B needs to be mobile. With the consent of both parties through consultation, Party B implements the flexible working system.

Article 9 During the contract period, Party B shall take a vacation in accordance with state regulations.

Fourth, labor remuneration.

Article 10 Party A shall pay Party B monthly salary in cash, and the monthly salary shall be RMB. Among them, the probation salary is RMB.

Verb (abbreviation of verb) social insurance Article 11 During the contract period, Party A shall handle social insurance for Party B in accordance with the relevant regulations of the state and local governments, of which the unit contribution shall be paid by Party A, the individual contribution shall be paid by Party B, and Party A shall withhold and remit the payment from Party B's salary.

Article 12 Party B's work-related injury treatment shall be implemented in accordance with the relevant regulations of the state and local governments.

Article 13 The medical treatment period and treatment for Party B's illness or non-work-related injury shall be implemented according to the relevant regulations of the state, local government and Party A. ..

Article 14 Party B's funeral subsidy, one-time work-related death subsidy, relief fund for supporting immediate family members, pension for supporting immediate family members or regular living allowance, etc. In accordance with the relevant provisions of the state and local governments.

Six, labor discipline and rewards and punishments

Fifteenth without approval, shall not leave the car, shall not be sent to the factory for maintenance.

Article 16 When you park your car outside or when you come back, you must pay attention to choosing the parking place and location, and you can't park on the "no parking section" or "dangerous section". When leaving the vehicle, Party B shall lock the safety lock to prevent the vehicle from being stolen. Article 17 Party B shall pay attention to rest at night and shall not drive tired vehicles. It is forbidden to drink and drive.

Article 18 When driving, Party B must abide by the traffic rules and drive in a civilized manner, and shall not drive dangerously (including speeding, climbing the head, following closely, fighting for lanes, racing, etc. ).

Article 19 If Party B is fined due to violation of regulations or incomplete documents, the expenses will not be reimbursed; If the user insists on doing so, it shall be borne by Party B and the user.

If the compensation cost caused by Party B's violation exceeds the amount claimed by the insurance company, Party B shall bear it by itself. Other consequences caused by violation of regulations shall be borne by Party B. ..

Article 20 If Party B is not dispatched during working hours, it shall wait for the bus to leave at the working place designated by Party A at any time and shall not go out without authorization; When you come back from the car, you should report to the supervisor immediately.

Article 21 Party B must carry a mobile phone and keep in touch with Party A at any time.

Article 22 After work, Party B shall take good care of the vehicle and shall not use the vehicle without permission.

Article 23 Without the approval of Party A's leadership, Party B shall not hand over the vehicles it drives to others for driving or practicing driving. It is strictly forbidden to give the vehicle to an unlicensed person to drive. No one is allowed to use Party A's vehicle to learn to drive.

Article 24 If Party B violates the above-mentioned relevant regulations, it shall be punished according to Party A's relevant labor rules and regulations, and the "10,000-kilometer driving safety award" shall be implemented with reference to the relevant assessment methods of Tongchuan Power Supply Bureau's driver safety driving award.

Party A:

Party B:

date

6 Client (hereinafter referred to as Party A): Wuxi Huaguang Boiler Co., Ltd. Carrier (hereinafter referred to as Party B):

Through negotiation between both parties, Party A entrusts Party B to carry the following goods and sign this contract.

First, the transportation content:

1. Name of goods: weight:

2. Arrival time:

3. Total transportation price (including transportation cargo insurance): _ _ _ _ _ _ _:

Second, the payment method:

1, 3% after shipment is the quality deposit, which shall be paid synchronously according to the equipment payment of the receiving unit.

Three. Transportation requirements:

1. Before each batch of goods is shipped, Party B shall issue a product waybill (in quintuplicate) to Party A, then pick up the goods at Party A's warehouse, and sign the third copy of the product waybill (finished product warehouse) after picking up the goods.

2. Party B shall send the first two waybills of the on-board products, of which the receiving unit shall send them to the receiving unit for acceptance, and the receipt shall be returned after being signed by the receiving unit. After all the goods in this contract are shipped, the freight will be settled by receipt.

3. After receiving the transportation notice from Party A, Party B shall issue the product delivery waybill to Party A within half a working day, load the goods to the warehouse designated by Party A within two days at the latest, and promptly notify the receiving unit to make preparations for receiving and unloading the goods. If Party B delays the shipment, it must obtain the consent of Party A..

Agree, otherwise, Party A shall pay a penalty of 500 yuan/day. If Party A disagrees with Party B's delay in loading and delivery, Party B must load and deliver the goods the next day. Otherwise, Party A has the right to take back the waybill of this batch of goods and organize the shipment of this batch of goods by itself, and the transportation expenses incurred shall be deducted from the total transportation price of Party B. If the shipment is delayed due to Party B's reasons, causing complaints from the receiving unit and causing reputation damage and economic losses to Party A, Party A may hold Party B responsible, and Party B shall bear the corresponding economic compensation, and Party A has the right to terminate the transportation contract between the two parties.

4. Party B shall be responsible for any loss or damage of the goods during transportation.

5. Before transportation, Party B shall insure the contract equipment with insurance company for 65,438+000% of the equipment price, and the insurance period shall be 65,438+00 days after delivery from Party A's warehouse to the destination specified in the contract.

6. In the process of transportation and loading and unloading, Party B shall be responsible for all environmental safety accidents. ..

This contract is made in triplicate, two for Party A and one for Party B, and shall come into effect after being signed and sealed by both parties.

Party A: Party B:

Representative: representative:

Month, day, 20 years

Article 7 of the Transportation Contract Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party A and Party B are willing to undertake the transportation of sand, gravel and cement for the road hardening project in Xiaomi Village based on the principles of legal compliance, fairness and justice, honesty and trustworthiness, and mutual benefit. In order to complete the transportation task safely, on time, with good quality and quantity, the following contract terms are hereby concluded.

First, the mode of cooperation

1. Party A provides sand, stones and cement for Party B to transport.

2. Party B shall cooperate with Party A to transport materials such as sand, gravel and cement to the designated place.

Second, the project point freight

Third, freight settlement.

1. Party B shall settle the freight charges with Party A on the basis of the Application Form for Receiving Materials for Village-level Public Welfare Project in Wangmo County and the Material Delivery Form for Village-level Public Welfare Project in Wangmo County.

2. Party A shall settle all the freight charges within one month after checking according to the Application Form for Receiving Materials for Village-level Public Welfare Project in Wangmo County and the Freight Bill for Village-level Public Welfare Project in Wangmo County and the transportation unit price of various materials.

Four. Rights and responsibilities of Party A and Party B

1. Party A issues the Application Form for Material Purchase of Village-level Public Welfare Project in Wangmo County, and entrusts the representative to transport the materials to the gravel yard or cement plant with Party B..

2. Party A and Party B shall adhere to moderate loading to ensure the safety of people and vehicles.

3. Party B shall abide by the traffic rules and load cars in an orderly manner to prevent accidents.

4. Party B shall be responsible for all safety responsibilities during the transportation of materials for the whole project.

Verb (short for verb) others

1. This contract is valid for two months.

2. This contract is in quadruplicate, one for each party, one for the township project office and one for the county comprehensive reform office.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _