What are the weather requirements for paint construction?
First, the six working procedures of painting construction
1, primary treatment
Before the wall paint construction, the wall foundation should be treated. First, the peeling and loose parts of the wall should be leveled, and the residual dust and dirt on the surface of the grassroots should be removed.
2, putty grinding
The second step is to repair the putty, leveling the concave part of the wall with water and gypsum respectively, and polishing the convex part with sandpaper after drying to clean up the floating dust attached to it.
3, brushing interface agent
After the putty of different wall bases is polished, you can choose to brush the interface agent next. The interfacial agent can enhance the adhesion to the base and avoid the phenomenon of hollowing and shelling of the plastering layer. When you brush the interface agent, you must brush it evenly.
4, brush primer
After brushing the interface agent, you can brush the primer. Primer can be brushed once, and it must be uniform. After drying (2-4 hours), the next step can be carried out.
Step 5 brush the top coat
Generally speaking, the top coat should be brushed twice, and the interval between each time should be more than 2-4 hours (depending on the drying time of the surface). It takes 1-2 days for the paint to completely dry after the second coating. Before the paint is completely dry, pay attention to waterproof, drought-proof and sun protection to prevent problems with the paint film.
Step 6 accept
When the wall paint is accepted, pay attention to whether the wall color is consistent and whether there is color difference. Whether there are problems such as missing coating, mixed color and sagging on the wall surface. Touch the wall with your hand to see if it is smooth.
Second, what are the weather requirements for paint construction?
The construction of paint has certain requirements on temperature and humidity, so the change of weather has great influence on the construction of paint. The drying of coating and conjunctival effect depend on temperature and humidity. Different types of coatings have their own film-forming conditions. Generally, solvent-based coatings should be applied at 5-30℃. Too hot weather will make the paint dry too fast, affecting the durability of the paint, and too cold will lead to the paint can not be completely dried.
The above is the information that Bian Xiao shared for you about the six working procedures of painting technology and the weather requirements of painting construction. I hope it helps you.
- Previous article:What was the weather like in Quanzhou on September 23rd?
- Next article:What kind of weather phenomenon is graupel?
- Related articles
- Good morning, new greetings.
- Shenzhen landmark building
- What does Chusu mean?
- When did Zhengzhou start to get cold?
- The ace qigong of all walks of life in the hot-blooded Jianghu.
- What's the name of Sue's novel?
- Keep warm in cold weather
- Yongxin, how long does it take to dry the meat?
- How to cancel a new weather order
- What's the weather like in Guizhou recently