How time flies! A period of work has ended. Looking back on my past work, I feel very fulfilled and have gained a lot. It's time to write a work summary and analyze the past work. Are you still worried about writing a work summary? The following is a summary of my personal work on transmission lines for everyone. Welcome to read the collection.
Transmission Line 1 Personal Work Summary 20xx Work Review
Lanzhou East-Tianshui-Baoji 750 kV double-circuit transmission line project is an important part of the northwest 750 kV main power grid and the main power high-speed channel connecting Gansu and Shaanxi power grids. Under the care of the leaders of Gansu Electric Power Company, Construction Company and Qinghai Power Transmission and Transformation Engineering Company, and with the strong support of the owners, supervisors and other units, my bid section of Lantianbao 750 kV line project, which my project department is responsible for, has earnestly implemented the overall deployment of the construction company for the project construction. All the contractors closely focused on the annual completion goal of our project department, overcame the environment such as road floating soil and strong wind, broke through the heavy encirclement of policy coordination, overcame difficulties, carefully organized and flexibly used construction methods to complete.
(a) the completion of the main indicators
In the construction of Lantianbao 750 kV line project, the project department continued to carry forward the five "special" spirits of Qinghai-Tibet line. All contractors participate in process planning, communicate with each other, optimize the construction method, overcome many difficulties under the cohesion of the project department, resolutely implement various decisions of Gansu Electric Power Company, Construction Company, Qinghai Power Transmission and Transformation Engineering Company, the owner and the project supervision department, and actively follow the requirements of activities such as "Safety Management Improvement" and "Quality Month" by superiors. Under the careful leadership of Yang Jining, the general manager of the company, and with the full support of the engineering construction department of the company, Qi Xin, all employees of Lantianbao Project Department, worked together to successfully complete the annual target set by the project department. The main tasks are as follows:
On September 4th, 1.20xx, 8 1 all the foundations of the foundation iron tower were poured, and the concrete volume was10765.1m;
2.20 XX1June1May Complete the assembly of all 8 1 base towers, including 75 base angle steel towers and 6 base steel tube towers;
3.20 xx165438+1October 14, and the stringing construction was completed by 2*20.67km.
(2) Mainly complete key tasks (highlights)
Since the start of construction, the project department has carefully planned and prepared each working procedure with a high starting point, high goals and high standards in accordance with the overall requirements of "standardized management, advanced technology, excellent quality, reliable operation and reasonable life cycle cost", vigorously popularized and applied the "three innovations" technology, took the project safety and quality work as the core, carefully organized the preparation of plans and measures, completed the examination and approval step by step, and adhered to the principle of "progress obeys quality and quality obeys safety" The main highlights of the project construction are summarized as follows:
1. Imported rebar straight thread connection equipment.
In order to improve the construction efficiency, save raw materials, reduce environmental pollution and popularize the application of "three new" technologies, the project department adopted mechanical connection in the connection of foundation reinforcement, which reduced the workload of processing and welding, improved the construction efficiency, saved a lot of raw materials compared with welding, and achieved obvious economic benefits.
2. The composite insulator is connected by a pole-Tara line erected near the charged body.
The project department is responsible for the construction of blocks near 330kV, 1 10kV, 35kV and other running lines, and individual towers are located in the middle of two live lines, so the tower assembly construction is very difficult. After the calculation of technical data, the project department decided to adopt the scheme that the inner stay wire assisted the outer stay wire to erect the tower near the live line, and the part of the outer stay wire near the running line was connected with the composite insulator, which effectively prevented the harm of static electricity to the construction and improved the construction efficiency.
3. The steel pipe tower should be installed with floor-mounted double flat arms.
The project department is responsible for the construction of Bid Section 6, which is a steel tube tower, and the risk of using suspension rods in assembly construction increases, especially the two 750kV lines parallel to both sides of G 1# tower, and the nearest distance is only15m, so the construction risk reaches Grade 4. It makes full use of the advantages of holding the pole with a flat arm without external cable and flexible swing of the boom, effectively avoiding the construction in the adjacent line area, controlling the construction risk, reducing the greening compensation cost, and meeting the standard process requirements.
4. Standardization of project department and team construction
Provide a good office and accommodation environment for construction personnel, and rent a residence equipped with activity room, conference room and sports facilities according to the requirements of construction standardization of the project department. The area is neatly arranged, the rooms are equipped with uniform sheets and quilts, and the interior decoration is neat. All kinds of post responsibility cards and signs are placed in an orderly manner, all kinds of activity banners and cartoons are placed in an orderly manner, and TV and other leisure facilities are fully equipped. It fully embodies the "people-oriented" spirit of young people.
5. Establish a temporary party branch
The party building linkage activities of the temporary party branch of our project department are led by the party building linkage group of Gansu Electric Power Company Construction Company. In the construction of the project, we actively carried out activities such as "five competitions and one creation" to tell the history of the party and publicize the party's thoughts, and achieved remarkable results. Many contractors apply to become party activists as the party's reserve force.
Second, the difficulties in the work and the situation faced
This project department is responsible for the construction lines crossing Xiaokangying Town, Qingshuiyi Town, Gancaodian Town, Gaoya Town, anding district City of Dingxi City, Chedaoling Forest Farm and Xiankou Town, including 6 towns and 17 administrative villages. Crossing 330kV line 4 times, 1 1 10kV line 8 times, 35kV line 5 times,110kV line 25 times, Longhai Railway/kloc-0 times, Qinglan Expressway/kloc-0 times and National Highway 209, 312 times.
1. Crossing 330 kV power line
G69 # ~ G82 # overhead lines cross 330kV to pacify the primary and secondary circuits. Under the coordination of the project department, the construction company of Gansu Electric Power Company and local bureaus, a series of factors, such as road icing and tower icing, will become the difficulties in the later construction because of the inability to cut off power due to "keeping electricity for the winter".
2. Crossing the Longhai Railway
From the initial stage of stringing construction, the project department began to contact and communicate with lanzhou railway administration and Dingxi Works Depot, requesting to provide skylight points for erecting the spanning frame. Lanzhou railway administration began to reject the feasibility of the erection scheme of the straddle frame, demanding that it be displayed and released by airship or other large machinery, and did not agree to affect the railway operation. Later, the review rejected the airship scheme and demanded the implementation of the straddle loading scheme. The plan is repeatedly changed and the audit time is too long, and the given skylight time is constantly changing, which changes the progress plan as a whole.
Three. Working ideas and measures for 20XX years
Looking back on 20xx, from the resumption of the project to the completion of the ground conductor exhibition, all construction workers overcame a series of problems caused by natural and human factors. Take safety, quality and civilized construction as the main line, strengthen site management and pay attention to process supervision. According to the engineering geological characteristics and the construction difficulties of adjacent lines, we organized planning in advance, made careful preparations, completed site risk re-measurement, insisted on daily pre-shift disclosure, and strictly implemented the "same entry and same exit" system of State Grid Corporation, which achieved good results in engineering construction. At the same time, the project department is also clearly aware that there are many problems and deficiencies in the project construction that need us to sum up and correct, and will draw inferences from others and improve them in next year's work.
1. Strengthen the management of engineering construction to ensure that the progress is completed on schedule.
According to the overall milestone plan of the owner's project department of the construction company of Gansu Electric Power Company, strengthen the project construction management to ensure that the construction process is controllable, controllable and controlled, and ensure the smooth completion and acceptance of the project. According to the overall goal of "standardized management, advanced technology, excellent quality, reliable operation and reasonable life cycle cost" of this project, and on the basis of 20xx years of engineering construction experience, we will vigorously do a good job in project maintenance, strengthen quality management in the whole process, and create excellence at one time to ensure smooth completion and acceptance.
2. Seriously implement management measures to ensure construction safety.
Conscientiously implement the policy of "safety first, prevention first, comprehensive treatment", fully implement the standardized requirements for the company and the owner's project department to resume work, complete the education and disclosure plan for the personnel entering the site, complete the on-site risk investigation and measures formulation, do a good job in the spring safety inspection activities, deepen random, regular and special on-site inspections, intensify the investigation of hidden dangers and the disposal of illegal publications, and consolidate the foundation of the project construction.
3. Strengthen internal and external coordination and organize personnel to be in place actively.
Strengthen communication and cooperation with the company, local bureau, owner's project department, supervision project department and outsourcing team, focus on completing the power outage procedures of 330kV pacify primary and secondary circuits, complete the preparation of tools and personnel in advance, and complete the stringing construction on schedule.
Four. Opinions and suggestions on the company
With the care and help of the company's leaders and management departments, all the work of our project department was carried out in an orderly way, and the foundation, tower branch project and grounding line exhibition were successfully completed. In the subsequent project construction, we will continue to obey the company's management, implement the company's various work requirements, and ensure the safe completion of the project construction. Put forward some suggestions to the company and hope to adopt them.
1. Strengthen the practical ability training for new employees and make progress through various labor competitions.
2. Establish a platform for employees of the branch to communicate with each other, learn from each other and communicate with each other, sum up advanced technologies and good methods of filing materials, and promote them throughout the company for common progress.
Summary of personal transmission line work 2 I. Basic situation
(1) Status of professional working institutions and main personnel of overhead transmission lines
As of February 20XX 1 February 8, Nanchong Central Line has 26 professionals, including 1 Deputy Director in charge of Central Line,1Technical Director of Line Operation and Maintenance, and 24 line operation and maintenance personnel. The center now has two professional teams, one is line patrol and the other is line patrol. There are 5 people with tower climbing maintenance ability and 6 new employees.
(two) the basic situation of the line under its jurisdiction
At present, the center has 10 lines with a length of 539.983 kilometers, and 1 144 iron towers. The line corridor passes through Gaoping District, Shunqing District, Jialing District and Xichong County of Nanchong City; Qu County and Da County of Dazhou City; Guang 'an District, Guang 'an City and Yuechi County. Among them, 500 kV Nantan Line 1 and Line 2 and 500 kV Nanhuang Line 1 and Line 2 are assets of Huazhong Net Company, which are now maintained by Sichuan Company.
Second, the main work of operation management
(a) the main situation of the professional management bank
In 20XX, the center attached importance to and consolidated basic management, and successively issued or improved the rules and regulations of Nanchong Center, such as Inspection Management Measures (Trial), Detailed Rules for the Implementation of Special Inspection (Trial), Defect Management System (Trial), Detailed Rules for the Implementation of Mass Line Guard (Trial), and Standard for the Construction of Line Patrol Team (Trial).
The center analyzes and summarizes the monthly and quarterly line work, holds a line operation analysis meeting in a down-to-earth manner, sorts out the line work last month, analyzes the nature of line defects, implements the defect treatment methods and responsible persons, and arranges the key work next month. In addition, the center strictly implements the pre-shift and post-shift meetings, and carefully analyzes and summarizes each power outage, laying a solid foundation for the safe and smooth completion of the annual 10 line maintenance.
(2) Operation and maintenance of the production line
(1) Regular patrol work
First, adhere to regular standardization >; Patrol work. During the inspection, it is required to inspect the equipment itself, ancillary facilities and external environment, strictly in accordance with the inspection contents and items in the check card for Line Standardization, and classify and record the problems found according to the standards.
The second is to adhere to the patrol responsibility system, and the line patrol is carried out with fixed lines, posts and personnel. Each line clearly defines the personnel who regularly patrol, and links the patrol rate with economic benefits, and strictly imposes performance penalties on lines that are not inspected. At the same time, the patrol work of changing lines was carried out at the end of the year, and the replacement of personnel and lines effectively made up for the shortage of long-term line setting and quota patrol.
The third is to adhere to the combination of inspection and compensation and give full play to the advantages of integration of transportation and inspection. For the defects that don't need power failure, the patrol personnel are arranged to deal with them in regular patrol inspection, which not only saves the operation and maintenance cost, but also improves the efficiency of line defect elimination.
Fourth, strengthen the quality of regular inspections, implement graded supervision and inspection by squad leaders, special supervisors and directors in charge, strictly implement the inspection system, and strengthen operation management through digital photography and GPS data positioning and collection during inspections.
(2) Special patrol work
During the peak winter, the first and second circuits of the 500 kV Guangzhou-Huanghua transmission line and the Huangyi and second circuits of the 500 kV Sichuan-Chongqing tie line were specially inspected. Infrared temperature measurement and other technical means are widely used in special inspections, focusing on observing the heating of the main stress components; The important span, structural clearance distance, ground distance and wind deviation distance are measured. Pay attention to the discovery of external hidden dangers and deal with external construction and other hidden dangers in time.
According to the particularity of the line work, a special inspection was carried out. During the flood control period, arrange a special inspection team to conduct special inspections on the important crossing of the central line, the river-crossing tower foundation and the sliding door tower; In order to prevent the line from being threatened by geological disasters, special inspections were carried out to clean up the lines within the jurisdiction of the line, and geological disaster sections such as cliffs, precipices, dangerous rocks, passes, valleys, paddy fields and mining areas were subdivided, further improving the ledger of central geological disaster sections; In order to prevent the possible impact of freezing rain and snow, a special inspection was organized to prevent icing in the design ice area of 500 kV Huangda and 500 kV Bada lines and high-altitude pole towers.
In order to ensure the maintenance quality and strict defect closed-loop management, the center combines the diagnosis patrol before maintenance with the survey work. Before power outage maintenance, carefully organize the line diagnosis patrol, fully understand, master and judge the line operation status and hidden dangers and defects, effectively ensuring the maintenance work.
The center is responsible for participating in at least/kloc-0 line inspections every month, conducting a thorough investigation and spot checks on periodic line inspections, and organizing diagnostic inspections before major maintenance, so as to better understand the operation status of each line and the work of inspectors and better guide the actual line inspections from point to surface.
The leaders of the center conduct supervision and inspection from time to time, check the inspection effect and quality, and give guidance to the line inspection.
(3) Channel management
This year, the center vigorously carried out the rectification work of the line passage, combined with the special rectification of the company's passage, eliminated all the serious and key defects of the passage, and cut down and pruned more than 5,300 trees and bamboos in the line passage, effectively preventing accidents such as grounding and conductor burning caused by the discharge of ultra-high trees and bamboos in the passage.
(4) Protection of power facilities
The center has always regarded the protection of power facilities as one of the basic work of center line management, and strengthened the technical protection of power facilities. According to local conditions, the combination of technical defense, civil air defense and physical defense will establish a long-term mechanism for the protection of power facilities to create a good environment for the safe operation of the power grid. First, in view of the behaviors that endanger power lines, the center has repeatedly issued written safety hazard notices and rectification notices to relevant responsible units and personnel, and actively sought government support and intervention by sending safety hazard letters to government functional departments such as the "Three Electricity Offices", the Economic Bureau and the Safety Supervision Bureau. , effectively prevented and stopped the construction of a large number of houses in the line protection area, especially the construction of 57#-58# large pig farms on the second line of 500kV Nantan. Second, it is of great significance to hold a forum on power facility protection, strengthen communication with local governments, and establish a "three-level network" mechanism among the central government, the government and the masses, which will effectively crack down on power facility crimes and stop units or individuals from illegally building structures in line protection areas. Third, the center combined with the safety production month activities, further increased the publicity of power facilities protection, produced all kinds of publicity materials, and went deep into villages and towns to carry out publicity of power facilities protection, which achieved good results and had great influence.
Personal transmission line work summary III. Work for 20XX years
1. Completion of main indicators (as of165438+1October 27th).
In strict accordance with the work requirements and specific arrangements of the superiors, a feasible route inspection scheme is formulated and put into practice, and at least two route inspections in normal months are completed as planned throughout the year, totaling nearly 1 000 kilometers.
Actively carry out special inspections for various special weather to ensure safe and stable power supply.
2, patrol maintenance work
By the end of June, 1 1, 23 bases of weeds in the tower foundation have been inspected and cleared, 6 bases of foundation earth wire 12 have been tightened, 2 1 tree under the line has been cut down, 5 1 tree has been trimmed, 5 bases of corner tower corner protection and vertical measurement have been carried out, and 6 bases of conductor sag measurement have been carried out.
3. Safe working conditions
According to the requirements of the code, the patrol personnel were inspected in safety, three-person inspection, autumn inspection and spring inspection, and the safety bulletin of a certain Ministry of State Electric Power was carefully studied, so as to sum up experiences and lessons and improve safety awareness.
Second, the gaps and deficiencies in the work, rectification measures.
Clearing off-line tree barriers is the focus of this year's work. Since the beginning of this year, the hidden dangers have achieved remarkable results. However, due to coordination, planting trees in front of the line and other reasons, the work is difficult. It is hoped that all departments and wind farms of the company will continue to provide strong support to help coordinate management.
Three. Work ideas and key work arrangements for 20XX years
(1) working ideas.
Take fine work as the main line, improve the management level of line work in an all-round way, and improve the health level of equipment and the professional level of staff in line with the principle of "safety first, people first".
(2) Key tasks.
Do a good job in equipment management and personnel management, and increase the management of hidden dangers of offline obstacles. Strictly implement the spirit of all instructions to ensure the smooth completion of all work.
Four. Suggestions on the Company's Work in 20XX
1. I hope that the company leaders will continue to increase their support for the line inspection class, continue to improve the age structure of line personnel in terms of personnel, and ensure the continuity of line work.
2. Work problems that need to be coordinated and solved at the company level.
The management of offline hidden dangers, especially the cleaning of offline trees, needs the strong support of all departments of the company.
;
- Previous article:Yunyang sunshine beach writing composition
- Next article:The weather in Shishe Village
- Related articles
- Which part of Hunan does Huitong County belong to?
- How can garlic be preserved so as not to germinate?
- The weather in Sangri County, Shannan region
- The weather in Xinjin from August 7th to 10.
- How to quickly remove formaldehyde?
- A short story about the weather.
- What should I do if my face turns yellow
- The main culprit of cold air going south this year may be polar vortex. How does polar vortex affect the weather in China?
- The branch peaks of Wumeng Mountain
- Do you know how to play Tianmen Mountain in Zhangjiajie?