2022 Flood Control Notice Sample (Selected 6 Articles)

During the rainy season, in order to effectively strengthen production safety during the flood season, strictly prevent the occurrence of various accidents, and ensure safe production and the safety of employees' lives and property during the flood season. The following is the "2022 Flood Control Notice Sample (Selected 6 Articles)" compiled by me for everyone. It is for reference only. You are welcome to read this article. Chapter 1: Sample Notice on Flood Control in 2022

Various departments:

We have now entered the rainy season. In order to effectively strengthen production safety during the flood season and strictly prevent the occurrence of various accidents, according to the national, In the spirit of the instructions of the province, city and company on wind prevention, flood prevention and lightning protection, we adhere to the principle of "safety first, prevention first, comprehensive management, and preparedness", clarify responsibilities and implement measures to ensure safe production and the safety of employees' lives and property during the flood season. , the specific work matters are now notified as follows:

1. Flood prevention, wind protection, and lightning protection requirements in the factory area

1. Emergency preparation:

⑴ Each department should Listen and pay attention to weather forecasts, notifications and other information in a timely manner to prepare for emergencies. ⑵ The production department should be prepared for flood prevention work, set up a flood prevention team, and check the implementation of flood prevention materials (sand, bags, shovels, etc.), and be on call once flood conditions occur.

2. Flood season inspection:

⑴ The production department should conduct self-inspections on its outdoor electrical, pipelines, wiring, electrical facilities, etc., and any problems found should be resolved before the flood season. The focus is on checking for house leaks, wall cracks, etc., reporting and repairing them in a timely manner, and organizing personnel to remove silt and water accumulation in drainage pipes;

⑵Inspect parts that are easily damaged by strong winds and prone to rain leakage , a rectification and reinforcement plan should be submitted as soon as possible and a rectification and reinforcement plan should be formulated. After approval by the company, reinforcement and renovation should be carried out to enhance the ability to withstand strong winds and heavy rains and ensure that no problems occur during the flood season.

⑶ Prepare backup water pumps in areas where water intrusion may occur in advance. Once water intrusion occurs, immediately install a submersible pump to drain water in time. Conduct sandbag inspections and drainage pump inspections in the pump room of the water meter calibration station to ensure nothing goes wrong before the flood.

⑷Each department should arrange for special personnel to check whether doors and windows are closed tightly and whether the power supply is cut off before leaving get off work. Prevent fire and water intrusion incidents.

⑸ Each department should arrange for electricians to inspect lightning protection measures in the responsible area according to the situation to ensure that lightning protection facilities, leakage protection, etc. are in good condition and available.

3. Emergency measures:

Once a flood situation occurs, the company office should be reported immediately, and the power should be cut off and the switchgear closed according to the situation, emergency lighting facilities should be prepared, and personnel should be organized to drain water and evacuate people in time. , set up warning signs to prevent leakage and injury accidents caused by water accumulation.

4. Personnel education:

Each department can conduct flood prevention knowledge training for employees according to the actual situation, and clarify preventive measures for key parts and measures to be taken in emergency situations.

2. Flood prevention requirements at the construction site

1. Electricity requirements during the flood season:

⑴ When it rains, materials stacked on the construction work surface must be protected from rain The materials should be covered tightly, and the wood underneath should be used to prevent materials from being soaked, rusted, deformed, and water intruded;

⑵ It is prohibited to stack flammable items near various power and lighting circuits, indoor lighting and on-site mobile devices. The lighting has reliable moisture-proof measures, and the distribution box and switch box have rain-proof measures. Non-electricians are not allowed to use electrical equipment or modify wiring privately.

⑶ Various electrical equipment used in the open air should be placed in a dry place at a higher level. The power switch box must be provided with rainproof measures. The welding machine should be placed in a shed that is waterproof, moisture-proof, sun-proof and well-ventilated. The outer casing of the welding machine must be well grounded, with a separate switch. Wear insulating gloves when opening and closing, and operate from the side.

2. Construction requirements during the flood season:

⑴ The ground of the stockyard (such as steel bar yard, lumber yard, steel pipe yard, etc.) at the construction site is higher than the site ground, and the ground must be Drainage treatment.

⑵ During construction during rainy periods, the stability of the foundation pit slope must be checked frequently. If there is a possibility of slope cracks or landslides, reinforcement should be carried out in time. Construction can only continue after the hidden dangers are eliminated.

⑶ On the construction operation surface, special personnel will be assigned to irrigate rainwater according to the location of the water collection pit in the project, and a water pump will be used to drain the water from the water collection pit to the on-site drainage pit.

⑷Adopt anti-slip treatment on construction scaffolding and pedestrian walkways, check the firmness and reliability of the scaffolding boards laid, and add anti-slip strips.

⑸ Full-time electricians regularly check the flexibility, reliability and safety of the leakage protection devices in each distribution box, and promptly rectify any problems to ensure the normal operation of the distribution box during construction.

3. Wind protection requirements at the construction site:

⑴ When operators carry out inspection, repair and maintenance work at high places, they should avoid doing it in windy weather. If necessary, they need to set up Install a safety rope and take protective measures.

⑵After completing work at high altitudes, all parts, tools, and waste must be cleaned up to avoid accidents that may cause injury to people or property due to strong winds.

⑶ Safety officers should strengthen patrols during strong winds, check whether the doors and windows of houses in the area are closed, whether signs, banners, etc. are in danger of being blown down, and report and rectify hidden dangers in a timely manner.

⑷Scaffolding operations are not allowed when the wind force exceeds Level 6.

⑸ Before the strong wind arrives, workers must be promptly arranged to evacuate to a safe area and pay attention to personal safety. ⑹ Before the arrival of strong winds, inspect, arrange, and temporarily reinforce the areas under your jurisdiction and major equipment such as tall and independent machinery, scaffolding, formwork, temporary facilities, fences, etc. Small machines and scattered materials stacked on floors and roofs must be stacked and reinforced. Things that cannot be fixed must be moved into the building in a timely manner. Personnel working at heights should evacuate to a safe area in a timely manner. After the strong wind, the formwork, steel bars, especially the scaffolding and power lines must be carefully inspected immediately. Any problems found must be dealt with in a timely manner. Work can only be resumed with the consent of the person in charge of the site.

⑺Strengthen the safety management of temporary facilities. It is necessary to conduct a comprehensive safety inspection of temporary facilities such as dormitories, offices, warehouses, and walls at the construction site. If there are hidden dangers, measures should be taken. Those that need to be reinforced must be reinforced. If personal safety cannot be guaranteed, personnel must be evacuated in time and evacuated. Demolition to prevent collapse accidents.

4. Lightning protection requirements at construction sites:

⑴In case of thunderstorms, especially after hearing thunder, safety management personnel should go to the site to inspect and correct problems immediately if any problems are found. At the same time, operators are reminded to pay attention to lightning protection, stop potentially dangerous operations when necessary, and evacuate construction workers to a safe area.

⑵ It is not advisable to use mobile phones, walkie-talkies and other communication tools in open areas during thunderstorms. Do not make or answer landline calls. Try to use hands-free phones.

⑶ During thunderstorms, indoor personnel should not use faucets, stay away from water pipes, heating pipes and other metal pipes and distribution boxes, close doors and windows and do not stay at doors and windows.

⑷During construction during thunderstorms, never take shelter close to power sources, big trees or poles. ⑸ Construction workers are prohibited from carrying out scaffolding construction during thunderstorms.

⑹ Safety inspections should be carried out after thunderstorms and daily maintenance of facilities should be done. For example, after a thunderstorm, you should check whether the overvoltage protector on the power supply and signal lines of computers and other electrical equipment is damaged. If damage is found, replace it in time.

⑺When a lightning disaster occurs, the situation should be reported to the relevant departments in a timely manner so that it can be dealt with promptly and avoid being struck by lightning again.

5. Requirements for inspection duty during flood season:

⑴ Strengthen the safety duty system during rain application, conduct rain application safety education to on-site employees before rain application, and overcome paralysis. Report any danger in a timely manner and organize rescue work.

⑵ Strengthen on-site safety construction inspections during rain applications. During rain applications, on-site safety officers are responsible for inspecting the implementation of on-site safety protection facilities and mechanical rain-proof measures, that is, the careful implementation of lightning protection and grounding facilities, and make Keep good inspection records and report problems for resolution in a timely manner.

⑶ After the storm, organize relevant personnel to inspect and maintain the engineering scaffolding, etc., and eliminate the discovered safety hazards in a timely manner. Continue to require the construction team to strengthen the implementation of the pre-shift speech system for construction personnel, clearly emphasize the safety precautions for construction during rainy periods, and improve the self-safety awareness of construction personnel.

⑷ Strengthen inspections on the implementation of rain protection, lightning protection, and drainage measures in the on-site stockyard. The preventive measures and disclosure requirements formulated on site will be carefully communicated and implemented to ensure that management and tracking are in place.

3. Emergency response

1. All departments should carry out emergency rescue operations based on the meteorological information released by the meteorological center and according to factors such as its nature, severity, controllability and scope of impact. emergency response.

2. In principle, emergency response requirements are divided into four levels: Level IV (blue), Level III (yellow), Level II (orange), and Level I (red). General, large, major and special natural disasters.

3. When a Level IV (blue) warning occurs, each department should arrange personnel to inspect the factory building, prepare emergency supplies, clean drainage pipes, ditches, construction sites, check electricity, etc. according to the division of labor according to the plan. Be well prepared for emergencies, and have the department head decide to initiate an emergency response based on the situation.

4. When a Level III (yellow) warning occurs, each department shall implement the requirements of Level IV (Blue) warning and arrange personnel on duty 24 hours a day. Any danger should be reported as soon as possible. , the department head decides to initiate emergency response according to the situation.

5. When level II (orange) or level I (red) warning occurs, each department shall implement the relevant requirements of level IV (blue) warning and level III (yellow) warning at the same time. , all members of the emergency team should be arranged to be in place and reported to the company to initiate emergency response.

IV. Responsibilities

1. Each department must include this work in the work safety schedule and set up a special team to provide unified command.

2. Each department should formulate a complete emergency plan, establish a leading group and report it to the company's safety supervision office for filing.

3. The emergency plan must clearly specify the list of team members, list of materials and equipment, team member responsibilities, team member contact numbers, etc.;

4. Various types of flood prevention, wind protection, and lightning protection materials Private appropriation is prohibited.

5. The person in charge of each department must be the first person in charge of the team and be fully responsible for flood prevention, wind prevention, and lightning protection. If the disaster relief and rescue work is not handled and controlled in a timely manner, resulting in safety hazards and accidents, he will be held responsible. Personnel accountability system.

6. During the flood season, members of the emergency team of each department must turn on their phones 24 hours a day to ensure smooth communication, ensure that abnormal situations on site are eliminated and controlled in a timely manner, and problems that occur during flood prevention work must be reported in a timely manner. Any violations of regulations must be reported in a timely manner. Those who fail to perform their duties will be dealt with seriously after investigation.

7. For matters not covered in the notice, each department is required to refer to the company's relevant safety management system for implementation.

All departments are requested to conscientiously implement the above notice, immediately carry out hidden danger investigation and rectification work, and submit the rectification situation and relevant emergency plans to the Safety Supervision Office in writing before 16:00 on x month for the record.

Safety and Quality Supervision Office

Part 2 on x, month, x, 20xx: 2022 Flood Control Notice Sample

Town and Street Agricultural Comprehensive Service Centers:

p>

In order to conscientiously carry out flood prevention and disaster relief work, in accordance with the deployment requirements of the provincial and municipal flood control and drought relief headquarters on flood prevention and typhoon prevention work, the Municipal Agriculture and Rural Affairs Bureau has decided to organize and carry out flood prevention and typhoon prevention inspections, and is hereby notified of relevant matters As follows:

1. Inspection time

From x month x day to x month x day.

2. Inspection content

Investigation of potential flood and typhoon hazards in key facilities such as high-efficiency economic crops, vegetable greenhouses, and agricultural demonstration parks (bases); maintenance, reinforcement, and dredging of vegetable greenhouses Drainage channel conditions; disaster relief materials such as seeds, fertilizers, and diesel, as well as flood prevention and disaster relief materials and equipment preparations such as drainage machinery.

3. Inspection Methods

All towns and streets are requested to adopt various methods such as on-site inspections and on-site spot checks based on the actual situation and the weaknesses and problems existing in flood prevention and typhoon prevention work in previous years. Carry out flood prevention and typhoon prevention inspections.

IV. Work Requirements

1. All towns and streets must attach great importance to this flood prevention and typhoon prevention inspection work, fully implement flood prevention and typhoon prevention work responsibilities, and further clarify the inspection content and carefully organize it Implement, adhere to a problem-oriented approach, and focus on prevention and control at the source. The Municipal Agriculture and Rural Affairs Bureau will dispatch an inspection team in the near future to conduct comprehensive inspections of various towns and streets to ensure flood safety.

2. All towns and streets must effectively strengthen organization, coordination, supervision and guidance, and carry out flood prevention and typhoon prevention inspections from an early, strict and detailed manner in accordance with relevant procedures and prescribed time limits. It is necessary to identify shortcomings and outstanding problems in flood prevention and typhoon prevention, urge the establishment of a rectification work ledger, clarify rectification responsibilities and measures, and do a good job of looking back.

3. After the inspection work of flood prevention and typhoon prevention is completed, each town and street must promptly summarize the organization and implementation of the inspection work of flood prevention and typhoon prevention, form written materials, carefully fill in the agricultural flood prevention and typhoon prevention inspection and rectification summary form, and prepare it with Reported to the Planting Industry Section of the Municipal Agriculture and Rural Affairs Bureau x day ago.

Municipal Agriculture and Rural Affairs Bureau

Part 3 of x month x day, 20xx: 2022 Flood Control Notice Sample

Each construction project department:

< p>According to the latest weather forecast issued by the xx Meteorological Bureau, heavy rains and heavy rainstorms are coming in our city, which can easily cause natural disasters. Notice of typhoon and flood prevention. In order to ensure the absolute safety of the personnel and property of our project management department, ensure the safety and smooth progress of the project, make the project successfully pass the flood season, and minimize the impact of the rainy season on the construction. According to the requirements of the superior authorities, the project management department is required to make specific arrangements for flood prevention and flood prevention during the rainy season:

1. The project department is required to establish a flood prevention and flood prevention leading group to be responsible for organizing comprehensive flood prevention and flood prevention work.

The Office of the Flood Control and Flood Control Command Leading Group is located in the Safety Department of the Project Department. The safety officer of the Safety Department is responsible for collecting daily weather forecast information and notifying the members of the flood control team of the weather forecast. When relevant departments at higher levels issue flood warning information, coordinate relevant departments and units to respond to flood warnings, and implement relevant flood prevention and emergency measures of the leading departments at higher levels.

2. Highlight key points and increase efforts to eliminate dangerous situations.

All construction project departments are required to attach great importance to it, strictly strengthen prevention work, quickly investigate disaster-prone points one by one, understand the situation of the construction site clearly, and carry out risk elimination and elimination work in a focused manner. . Key points to focus on:

1. Reinforcement of parking locations for large machinery and equipment;

2. Clearing of on-site drainage systems;

3. On-site materials and temporary use Electricity needs to be covered etc.

3. Strengthen responsibilities and adhere to the duty inspection system.

The flood control leading groups of each project department must strictly implement the day and night duty system. During the rainy season and flood season, they must adhere to the 24-hour construction site inspection duty system. Team members must stick to their posts and are not allowed to leave their posts without authorization. They must remain vigilant and observe at all times. Be careful, especially pay close attention to dangerous areas, and report any possible dangers to the project management department immediately.

In response to extreme weather changes, carry out inspections "before, during and after the rain". Once danger occurs, quickly activate the emergency plan and organize rescue operations immediately to prevent the accident from expanding, minimize losses, and ensure the personal safety and property of personnel. safety.

4. Install additional flood control facilities and prepare emergency flood control supplies.

On the premise of ensuring the smooth progress of flood control and flood control work, each project department must focus on prevention, prepare sufficient flood control and flood control materials and equipment, ensure the timely supply of flood control and flood control materials, and ensure the timely supply of flood control and flood control materials to all personnel. Carry out safety education on flood prevention and control to make them aware of the importance and hazards of flood prevention and control work.

It is hoped that all construction project departments will take immediate action after receiving this notice to effectively carry out flood prevention and flood prevention work and implement it.

This is to inform you. Chapter 4: Notice sample for flood control in 2022

Fisheries (in charge) bureaus of various cities, states, counties (districts):

According to the forecast analysis of the Meteorological Bureau, this year’s flood season (May-September) ) my country's climate conditions are generally deviating. Precipitation in the middle and lower reaches of xx is more than normal for the same period of the year. Extreme weather and climate events such as strong winds, thunderstorms, and storms are frequent, and severe floods may occur. In order to effectively carry out the fishery flood prevention and disaster relief work in our province in 20xx, ensure the safety of fishery production, and minimize disaster losses, the relevant matters are hereby notified as follows.

1. Attach great importance to and strictly implement the responsibilities of fishery flood prevention and disaster relief

First, deeply understand the importance of flood prevention and disaster relief, resolutely overcome paralysis and fluke mentality, and in accordance with the Party Central Committee and the State Council Decision-making and deployment and relevant requirements of the ministry and province, actively seek the support of the local party committee and government, and make every effort to do a good job in fishery flood prevention and disaster relief and safety production. The second is to effectively strengthen organizational leadership and enhance the awareness of responsibility. The main leaders must personally promote the implementation of various tasks, make arrangements in advance, strictly implement responsibilities, transmit pressure at all levels, and implement flood prevention and disaster relief responsibilities to everyone at their posts. The third is to pay close attention to the implementation of the fishery water safety responsibility system, further implement the main responsibility of the fishing vessel owner, the direct responsibility of the captain, and the post responsibility of the crew to achieve full coverage of fishery safety production responsibilities.

2. Comprehensive investigation and active implementation of various flood prevention and disaster relief measures

First, in accordance with the principle of “prevention first, combining prevention with rescue”, sum up past experiences and lessons, Improve emergency plans and systems for flood prevention and disaster relief. The second is to organize and carry out pre-flood inspections of hidden dangers in production facilities, focusing on inspections of pond ridges, dams, inlet and drainage channels and other facilities, repair and reinforce problems in a timely manner if problems are found, and improve construction standards to prevent ponds and dams from flooding; and promote the construction of fishery disaster preparedness nurseries. The third is to organize and carry out safety production inspections in conjunction with law enforcement activities such as closed fishing season management and crackdown on illegal activities, focusing on the preparation of disaster prevention and disaster relief materials, the provision of emergency rescue equipment for fishing vessels, the maintenance of fishery safety equipment and facilities, and the readiness of fishery administration vessels. The fourth is to strengthen the regulation, maintenance and construction of fishing ports (fishery administration wharfs) to ensure the safety of berthing of fishing boats (fishery administration vessels). Organize and carry out various forms of publicity, education, training and fishery water safety emergency drills to improve the fishermen’s awareness of disaster prevention and self-rescue capabilities.

3. Strengthen emergency duty and be prepared to respond to fishery emergencies

First, strictly implement the 24-hour fishery emergency duty system and urge enterprises, ship owners and breeding personnel to prepare for emergencies On duty. The second is to strengthen coordination and cooperation with meteorological, maritime, water conservancy and other departments to do a good job in monitoring and early warning of disastrous weather, and jointly carry out emergency rescue and aftermath treatment. Third, fishery administration vessels from all over the country should make preparations for sailing. Once danger occurs, they will immediately initiate emergency response and organize rescue operations. The fourth is to do a good job in disaster statistics and report them to the provincial bureau office in a timely and accurate manner in accordance with relevant requirements.

xx Office

Part 5 of x month x day, 20xx: 2022 Flood Control Notice Sample

All property service companies:

The 20xx flood season has arrived. In order to effectively carry out flood prevention work in the property community, ensure the normal operation of public facilities and equipment in the community, and protect the lives and property safety of residents in the community, we will now do a good job in the flood prevention related work in the property community in our county. The notice is as follows:

1. Strengthen flood prevention publicity work

All property management companies must widely publicize flood prevention knowledge and preventive measures during the flood season through publicity boards, electronic displays, and hanging slogans in the community. , especially the investigation and promotion of hidden dangers of flower pots and falling debris on the owners’ balconies. Early warnings and forecasts must be promptly notified to owners through various forms to help owners strengthen the implementation of self-prevention measures.

2. Organize and carry out pre-flood self-inspection and maintenance work

The property management company conducts comprehensive inspections of roads, main sewer networks, manholes, septic tanks and other facilities and equipment in the property management area. Inspection and maintenance should be carried out, and inspection records and assessment management systems should be improved to ensure smooth roads and drainage during flood season.

3. Prepare safety and emergency response plans

All property management companies must prepare flood prevention equipment and have dedicated personnel to keep it, implement the project manager responsibility system, and enhance the project manager’s awareness of responsibility and safety awareness, establish a flood control emergency plan leading group to be responsible for handling emergencies during the flood control period in the community, and carry out emergency response drills for heavy rainwater intrusion in underground garages, sudden flooding in the community, etc., to ensure that there are emergency plans , Disposal measures are in place.

During the flood season, all property management companies must adhere to a 24-hour duty system and report disasters in a timely manner. Chapter 6: 2022 Flood Control Notice Sample

All companies and departments:

The flood season in 20xx has arrived. In order to ensure that the mining companies, surface companies and other units of the xx Group can survive the floods safely, After research by the group leaders, the group’s arrangements for safe flood relief in 20xx are as follows:

1. Establish a flood prevention and relief leading group.

The top leaders of each unit are the first responsible persons. They must attach great importance to flood prevention and control and establish a flood control and rescue commando team. They must have a sound organization, clear responsibilities and tasks, and orderly command. The telephone numbers of the on-duty personnel at each key position should be kept open 24 hours a day. Pay attention to the weather forecast, report any problems in a timely manner, and handle them properly. Especially when abnormal weather such as strong winds, heavy rains, and high temperatures occurs, they can do a good job in disaster prevention and relief to ensure the safety of the group. Spend the floods.

2. Formulate an emergency plan for flood control.

All units should formulate an emergency plan for flood control and flood relief in 20xx based on water conditions and flood control experience in previous years, combined with this year’s actual production conditions, and carefully deploy various tasks during the flood season to plan early and Arrange and prepare early to ensure nothing goes wrong.

3. Implement flood control materials.

Each unit must prepare enough iron wire, woven bags, shovels, shovels, raincoats, rain boots, flashlights and other materials to be prepared.

xx Group

x, month, x, 20xx