Traditional Culture Encyclopedia - Weather forecast - Construction shutdown period of Yinchuan in winter

Construction shutdown period of Yinchuan in winter

The shutdown time of winter construction in Yinchuan is generally1October 15 to March15 of the following year.

According to the meteorological data of Yinchuan in Ningxia in previous years, Yinchuan entered the winter construction stage every year1October 29th 10, and ended the winter construction on March 27th of the following year, which lasted about five months. Among them, mid-February of 654381October +065438+65438 and mid-February to mid-March of the following year are low-temperature construction stages, and the daytime temperature is above 0℃ for about 50 days. 12 The period from late February to mid-February of the following year is the severe winter construction stage, which lasts about 70 days. In order to ensure the construction quality and the safety of construction personnel, Yinchuan area stipulates to stop work during this period to avoid the impact of bad weather on construction. Therefore, the shutdown time of winter construction in Yinchuan is generally1October 15 to March15 of the following year.