Traditional Culture Encyclopedia - Weather forecast - The No.6 typhoon "Fireworks" is coming this year. As a manufacturing enterprise, how to protect some machine tools and equipment in the factory?

The No.6 typhoon "Fireworks" is coming this year. As a manufacturing enterprise, how to protect some machine tools and equipment in the factory?

Affected by "fireworks", Zhejiang, Shanghai, Jiangsu, Anhui, Jiangxi, Fujian and other places will have a wide range of persistent heavy rainfall and windy weather. Due to the uncertainty of typhoon "fireworks" forecast, it may turn around and stay in East China after landing, bringing extremely heavy rainfall to Zhejiang and Shanghai, or affecting Jiangsu and Anhui in the north. It is suggested that the factory owners of all manufacturing enterprises pay close attention to the weather forecast and make preparations for typhoon prevention in advance.

Before the typhoon comes, comprehensively check the safety and firmness of all areas in the factory, including workshop doors and windows, open-air sheds, various items installed on open-air shelves or walls, rainwater drainage systems, various ditches, power lines, switch boxes, etc.

Focus on checking the material safety of the factory material warehouse, especially during the typhoon accompanied by strong wind, heavy rain and strong convective weather, the warehouse should do a good job of waterproof and moisture-proof.

Comprehensively check the firmness of flowers and trees in the green belt, including all kinds of potted plants, landscape trees and street trees.

To check the safety of the periphery of the factory, it is mainly to encounter rivers or slopes to prevent secondary disasters caused by typhoons and rainstorms.

Post publicity notices on relevant safety measures that should be paid attention to during typhoon. According to the intensity of the typhoon, the production plan of the factory should be adjusted in time. According to the requirements of the national defense general, the typhoon warning at the corresponding level should be stopped.

If there are any problems in the above inspection, we should immediately start rectification so that the prevention can be implemented.