Traditional Culture Encyclopedia - Weather inquiry - Summary of garden annual work

Summary of garden annual work

Summary is to review and analyze a certain period, a certain project or a certain work afterwards, so as to draw regular conclusions, which plays a connecting role in our study and work, so we should make a good summary and write a good summary. Have you figured out how to write a summary? The following is a three-point summary of my garden work for one year, which is for reference only and I hope it will help you.

Summary of the Annual Work of Gardens 1 20xx Since the year, with the correct leadership of the Party Working Committee and Management Committee and the strong support of relevant departments, the municipal garden department has focused on the goal of building an international tourism and holiday destination with beautiful ecology and a "pilgrimage island", "ecological island" and "holiday island", combined with the actual situation of island development and construction, in line with local conditions, suitable trees, improving soil, introducing new varieties and greening projects.

I. Progress in Greening in 20xx

Shelterbelt belt is 527.095 hectares, garden green space 133.2625 hectares, green space rate is 46.0 18%, and per capita garden green space area is 34. 170 square meters. 20xx*** introduced more than 4000 seedlings1.4000 through bidding, with an additional landscaping area of about 35000 square meters and an area of 80000 square meters for replanting.

Mainly completed the following work:

(1) Construction of parks and scenic spots

1. Emei Mountain Park: Covering an area of 582 172 mu, Emei Mountain Scenic Area has been transformed, and public facilities such as parking lots, retaining walls, management rooms, toilets and squares have been built, and the original greening has been transformed. Part of the construction will be completed in 20xx, such as the lighthouse construction, the main building of the central square and the greening of the entrance square.

2. Mangrove Park: Covering an area of about 400 mu, a garden road and a viewing platform will be built. At present, the entrance greening has been completed.

3. West Ring Landscape Project: Greening and upgrading the mountains around the West Ring, and building infrastructure such as garden roads and management rooms. The project is still under construction.

4. Ecological Botanical Garden: The planned area of the first phase is1.200mu, and an island plant ecological demonstration garden integrating island characteristic plants, ecological popular science education, coastal tourism landscape and professional germplasm resources protection will be built. 20xx greening task has been completed.

(2) Road and square greening

The main promotion projects include: building sidewalks and greening Chongfu Road for 2.3 kilometers; 2. 1km west roundabout road lifting and greening on both sides; Upgrade and transform the east road around the island for 3 kilometers, and green both sides; Upgrade 0.4km Ruyi Road and afforest it; 0.5km North Ring Road will be upgraded to enhance the landscape of Gongxia and Wen Jia Wharf.

(3) Nursery and greenway construction

Promote the construction of Xiting nursery in the aspects of site leveling, temporary road construction, water pipe laying and soil filling, and build it into a modern nursery. The construction of Mazu cultural corridor, which is 2 kilometers long from the pier to the ancestral temple, has been partially completed. Complete the greening promotion of 6 km in the middle section of the avenue and 1.2 km in the north section of the avenue. Cycling lanes around the island are under construction.

(four) unit courtyard and residential greening, roof and vertical greening.

It mainly completed the transformation and upgrading of the downhill area, Gongxiasha area and Niutouwei area, the greening of villages in the whole island, the transformation and greening of mountain bodies such as Niutouwei and Sanfo Mountain, and hundreds of greening projects such as courtyards of primary and secondary schools, troops stationed on the island and village rest parks.

(5) Greening and coloring of important nodes

Mainly completed Chedu Wharf Greening, Ecological Parking Lot Greening, Passenger Terminal Greening, Meiyu Park Greening, Pilgrimage Road Greening, Gongxia Node Greening, Mazu Tempel Scenic Area Greening, Meiyu Yin Chao Scenic Area Greening, Lianchi Flower Bed Node Greening, and New and Old Management Committee Greening along the road. Node greening is mainly based on planting all kinds of large-flowered trees and shrubs, and strives to create a colorful environment with flowers in all seasons. Among them, docks, Meiyu Park and flower beds also increase the colorful degree of flowers by planting grass flowers, and often change grass flowers to make the seasons bright.

(six) island greening replanting and maintenance

Regularly clean up the dead trees in the whole island and replant them in time, especially after the attacks of "Sudero" and "Du Fu", mainly replant Ficus microcarpa, Rose, Longbaiqiu, Celosia cristata, Mume, Cinnamomum camphora and duckweed. In terms of management and protection, adhere to the guiding ideology of "paying equal attention to greening and landscape, paying equal attention to construction and management" and promote the construction of ecological civilization in scenic spots. Through the growth characteristics and beautification effect of plants, the maintenance and management of corresponding tree species are carried out, such as fertilization, watering, pruning and shaping, pest control and sundries removal.

(seven) chrysanthemum exhibition and greening maintenance outsourcing matters.

The 5th Fujian Chrysanthemum Exhibition Putian Exhibition Area opened on June 4th, 165438+. According to the arrangement of chrysanthemum exhibition, our district actively promotes the preparation of chrysanthemum exhibition. On April 18, the bid was put up in the Municipal Development Service Center, and the tender was completed on April 27th. The winning bidder is Fujian Pusheng Construction Co., Ltd., and the winning bid amount is 26 1500 yuan. In order to better and more effectively green the island, some island greening and maintenance projects have been outsourced. The maximum price of the project is: 1), and the maximum price of green space maintenance is 14 yuan/㎡ year; 2) The maximum maintenance price of street trees within 20cm (including 20 cm) is 57.64 yuan/plant year; 3) The maximum maintenance price of DBH 21~ 35 cm street trees is 1 13. 16 yuan/plant year; 4) The maximum maintenance price of street trees with DBH above 35cm (including 35cm) is 178. 12 yuan/plant year. 20xx 165438+ 10/0 bid opening, 20xx165438+10 bid evaluation completed. According to the bid evaluation report, XX Shengjing Municipal Landscape Engineering Co., Ltd. was determined as the winning bidder, with the winning bid amount of 128 1624 yuan and the contract period of three years.

Second, the main measures of greening

1, leaders pay attention to ensure greening. The Party Working Committee and the Administrative Committee attach great importance to the greening work, incorporate the landscaping work as a whole into the national economic and social development plan, and organize the implementation at the strategic height of improving the ecological environment and tourism environment of the resort, with the top leaders personally grasping it and the leaders in charge specifically grasping it. In order to promote the smooth development of greening work, the Party Working Committee and the Management Committee have also established two sets of systems accordingly. First, implement the responsibility system of greening target management during the term of office of the main leaders of the unit. Decompose each specific greening project into relevant units, sign a letter of responsibility with each responsible unit, stipulate the project completion period and specific effect requirements, and regard urban and rural greening construction as one of the assessment contents of the main leaders and leading bodies of each unit. The second is to implement the greening project hook system. The leaders of the Party Working Committee and the Management Committee took the lead in grasping greening, linked several greening projects respectively, strengthened leadership, inspection, supervision and guidance for each project, and promoted the smooth development of greening work.

2, mechanism innovation, promote greening. In order to ensure the greening landscape effect and the quality of seedlings, the island greening project implements the principle that seedlings are purchased by Party A and supplied by Party A, and relevant personnel such as the Construction and Transportation Bureau, the Financial Planning Bureau, and the municipal garden department are transferred to set up a seedling procurement team and a seedling acceptance team to be responsible for the procurement of seedlings and the acceptance of seedlings entering the island. The seedlings needed for greening planting shall be summarized by the construction unit and submitted to the A purchasing team, and a specific purchasing plan shall be formulated. The seedling control team conducts market inquiry and purchase. After the purchased seedlings are transported back to the construction site, they will be accepted by the procurement team and delivered to the construction unit after passing the acceptance. The members of the two teams are separated, each performing its own duties and supervising each other to ensure the quality of seedlings.

3. Highlight the theme and focus on greening. The main methods are as follows: First, the greening on all sides has been accelerated. In accordance with the "Island Ecological Demonstration Village Creation Activity Plan", fully mobilize the masses to carry out greening in front of the house, behind the house, beside the water, beside the village and along the road, carry out greening in the open space around lakes and ponds, and plant tree species such as camphor tree, banyan tree, eucalyptus tree and Dalbergia odorifera. Second, the greening of units continued to advance. According to the Plan of Establishing Garden-style and Garden-style Units on the Island, the courtyards of directly affiliated units such as the island management committee, town government, primary and secondary schools, frontier defense and traffic police were fully guided to afforest independently, and a number of garden-style and garden-style units emerged. Third, green replanting is fully rolled out. Organize a voluntary tree planting activity in the whole region once a year, so that all voluntary tree planting sites are full of green. Promote the construction of new green space around the project, the coastal section of the North Ring Road and the intersection, and effectively increase the amount of green space. The fourth is to improve the quality of key areas. Highlight the characteristics of scenic spots, and carry out interplanting viewing in Mazu Tempel Scenic Area, Goose Tail Scenic Area, Meiyu Yin Chao Scenic Area and Meiyu Park. Pay attention to improving the quality, and carry out greening transformation and upgrading on important nodes such as docks on both sides, roads on both sides and East Ring Road, so as to improve the overall landscape level.

4, according to local conditions, careful greening. The greening conditions on the island are poor, and adverse factors such as wind, drought, sand and alkali have great influence. We mainly break through the restrictions from two aspects to ensure the greening effect according to local conditions. First of all, choose the right tree species and let them adapt to the right place. Choose different tree species according to different geological conditions. In the area of mountain tuyere, container seedlings are planted with soil, and tree species such as Pinus thunbergii, Pinus elliottii, acacia and acacia are planted; In coastal sandy land, choose coastal water spinach, Sophora alopecuroides and Pittosporum which are suitable for saline-alkali land growth; Banyan, oleander and bodhi trees are selected in the ancestral temple scenic spot to create the cultural atmosphere of the ancestral temple from the perspective of landscaping; In other scenic spots, choose plants with strong ornamental value, such as date palms, kapok, Erythrina, Ficus altissima and so on. On both sides of the avenue, multi-level greening methods are adopted, including ground cover plants, flowering shrubs, trees, oleander, shelter forests and so on. Planting from inside to outside in turn; In the construction of regeneration shelter forest, drought-tolerant and barren tree species such as Casuarina equisetifolia, Acacia acacia and Pinus thunbergii are mainly selected; Mangroves, such as Kandelia candel, are selected for greening on the west coast beach, and more than 500 mu of beach shelterbelts have greatly improved the coastal ecological environment; On both sides of the road, in the unit compound and in the park, the combination of arbor, irrigation, flowers and grass is mainly adopted to make the landscaping reflect the landscape characteristics, set off the architectural style and create a beautiful environment. The second is to improve the soil and adapt the land to trees. The first is "selection", that is, soil selection. Before April, suitable soil is selected for greening and filling, such as cleaning up the silt of Tiger Stone Pot and Lotus Pond for greening and filling the ancestral temple scenic spot. The second is "changing", that is, changing soil, clearing the soil unsuitable for planting trees and flowers on the green space and replacing it with new soil suitable for greening. The third is "blasting", that is, blasting rock to fill the soil, such as blasting rock excavation in the high column section of the avenue, and the scenic spots of Emei Shenshi Garden and Meiyu Park, and filling the soil for greening. The fourth is "enclosure", that is, land reclamation. For the places with narrow subgrade in the north of the island, kerbs are used for enclosure greening, and miscellaneous stones are piled up in some steep slopes on Ewei Mountain and Zumiao Mountain to ensure that the soil will not be washed away by rain. The fifth is "building", that is, building slopes to increase land, such as building a flower pond on the East Ring Road and building a retaining wall in Meiyu Park, which not only increases the green area, but also increases the thickness of the soil layer, which is conducive to conserving the green space foundation and ensuring the healthy growth of flowers and trees. The sixth is "protection", that is, planting shelterbelts or building landscape walls to create an artificial shelter environment for green space. Seventh, "fertilization", that is, fertilization and topdressing to ensure the normal growth of trees and societies. The eighth is "treatment", that is, timely control of pests and diseases, so that plants can grow healthily.

Third, the main problems

1. Village greening in Gongxiasha and Niutouwei cannot be done due to poor coordination among departments.

2. The progress of the new Xiting nursery is slow, mainly due to the poor coordination of the survey fish design, which affects the time for the fry to enter the island.

3. Older workers and fewer skilled workers lead to low maintenance level.

4. The environment on the island is harsh and the precipitation is low, so the existing three sprinklers can't meet the water demand for management and protection.

5. There are few professionals in landscape architecture, especially in design.

6. Greening varieties are still monotonous, and it is necessary to further strengthen introduction and domestication.

Four. 20xx work plan

1. Continues many large-scale New Year's projects such as Emei Mountain Park, Ecological Botanical Garden, Middle Avenue and North Avenue.

2. Design and construct the greening projects such as Mangrove Park, Mazu Cultural Corridor, West Ring Landscape, Chongfu Road Greening, North Ring Coastal Greening, Gongxia Distribution Square, Xiting Nursery, etc., which are not completed due to design changes, unfinished municipal works and early construction.

3. Accelerate the quarantine and disaster prevention project, and ensure that it passes the acceptance in 20xx and ends successfully.

20xx years passed quickly. Since the beginning of this year, under the correct leadership of the leadership, I have been working on the principle of "scientific development and down-to-earth". In this year's greening maintenance management, I constantly strengthened management, vigorously improved the level of engineering construction and maintenance management, and further improved the level of seedling management in greening projects.

Greening seems simple, but it is not easy. Planting flowers and trees all year round, pruning and weeding, watering and fertilizing are complicated and time-consuming. All work should be down-to-earth and pioneering.

First, be down-to-earth and conscientious.

Over the past six months, I have carefully studied the new rules and regulations of the company, got to and from work on time, been serious and responsible for my work, and never let go of every detail. Finish the work arranged by the leader on time. From thought to action, we should truly take the company as our home and take the company's affairs as our responsibility, so that everyone can have a small family first, and take the company's affairs, big or small, as the first priority, what the company thinks and what the company does.

In the greening project management, while strictly following the policies and regulations, industry norms and the requirements of the construction unit, I pay attention to accumulating a large number of first-hand information, accurately find the existing problems, and properly solve them at the first time. Provide all-round visual basis for its greening project, and strive to provide technical support for the maintenance level of landscaping and the management of unit greening project. In terms of safety in production, I put the responsibility into the hands of every specific practitioner, worked out the operating rules for greening maintenance, garden equipment and pesticide use management, and held a safety production meeting to eliminate potential safety hazards to the maximum extent and ensure the safety of employees and property.

Second, based on their own work, and achieved certain results.

At ordinary times, we will constantly strengthen our professional and non-professional study and improve the quality of the project. In the project construction, on the basis of concrete analysis, in line with the principle of adjusting measures to local conditions, combined with my own work experience, I strive to improve the landscape quality of public green space, not just to complete the task. I strive to improve the survival rate of seedlings and improve the management level to ensure the economic benefits of the company. With the joint efforts of colleagues in the company, the survival rate of saplings has been improved.

This year, I mainly participated in the construction and maintenance sites, mainly the North Outer Ring Road and Beichen Oasis. This year, the North Outer Ring Road site adopted surprise tactics, made the work compact, unified weeding, watering and cleaning, and now the North Ring Road is really in the final handover and acceptance. Beichen Oasis Project faces many difficulties such as demolition, design, cross-construction, project progress and seedling survival. However, the staff of Beichen Oasis were not intimidated by the difficulties. On the contrary, what inspires us in difficulties are all kinds of ways to overcome difficulties and confidence in solving problems. Under the leadership of the company's leaders and our strong will, Beichen Oasis has made certain achievements in the process of afforestation this spring, which has been recognized by the headquarters and company leaders. * * * More than 6 species of seedlings/kloc-0 were planted, including trees14,578, more than 3,700 shrubs and more than 350,000 ground cover plants and aquatic plants. Only the green * * * meter completed the project cost of xxxxx yuan. At the same time of greening, we have also completed a lot of earthwork. I didn't accomplish this achievement alone, it was the result of the concerted efforts of our whole team, and it was the pride of all of us in Zhuoxinyuan.

Third, recall the past and sum up experiences and lessons.

The maintenance and management of greening is the long-term tending and management of garden plants after project construction. The supervision of maintenance management should grasp the characteristics of the object to be maintained and find the most effective way, method and result. As the saying goes, "No pains, no gains", we should focus on the results and work hard on maintenance and management. And gradually and reasonably prepare the special construction plan to make the construction cost, construction quality and company benefits harmonious and unified.

In the maintenance work, it is also necessary to distinguish between construction and management. Greening engineering construction usually has the following characteristics:

1, single. For example, after planting a tree, digging a hole, returning the soil, righting and putting on a protective frame only complete the planting of a single tree, and it is no longer necessary to repeat it many times.

2. Process fixity. That is, in the process of greening project, the order of each working procedure is basically fixed, and there will be no major changes without special circumstances.

3. Time limit. That is, engineering construction generally needs to be completed within a certain period of time, which has certain urgency. In the good season of greening, in just a few days, the living habits of each seedling are different, and its suitable planting period is also different. We should seize the right planting time to improve the survival rate of seedlings.

Greening maintenance management is different from greening engineering construction, and accordingly has the following characteristics:

(1) Repeatability and persistence. For example, in a growing season, trees should be pruned many times in a reasonable time according to the growth status of plants; Spraying drugs at any time according to the occurrence and laws of pests and diseases, so a lot of work is often repeated in the maintenance of specific greening projects.

(2) The process is not fixed. The development of greening project management is usually easily influenced by many factors, such as temperature, rainfall and disastrous weather. There is plenty of rain, and it is likely that watering will not be needed for two months, but the increase of plant growth will increase the workload of pruning. Therefore, what needs to be done every day needs to be adjusted at any time according to the actual situation, and manpower and material resources should be arranged reasonably to meet the needs of plant growth, which is relatively mobile.

(3) seasonal. Protection and management work mainly changes with the seasons. Usually it takes one year as the cycle, such as pruning trees in winter for plastic pruning; During the growing season, dead branches and broken branches should be cleaned and trimmed in time; When sprouting occurs, it is necessary to carry out nutritional pruning to remove sprouting. The time limit is not very strict, as long as it conforms to its growth law and can promote the healthy growth of plants.

Therefore, the supervision of maintenance management should be different from the supervision of construction projects, grasp its own characteristics, find effective control points, find the most suitable working methods, make the management process orderly, reasonable and operable, and ensure the maximum economic benefits of the company.

In the actual maintenance work, I have made great efforts to ensure the survival rate and achieve the ideal landscape effect in the shortest time. In case of necessity, anti-season planting should also be carried out. Off-season planting should work harder than usual, pay attention to ways and means, and make its own environment and external environment harmonious and unified. Pay attention to science and improve the survival rate of seedlings by scientific methods.

Due to the timely greening management measures, the quality of greening projects has been effectively guaranteed and gratifying achievements have been made.

Fourth, put me in the present and create the future.

In the greening work, we should cheer up, seize the opportunity, strive to create conditions to solve problems and seek development, actively decompose and formulate practical work plans according to specific requirements, do a good job in all aspects, and increase construction and maintenance. Establish a more normal and benign work team and create a more harmonious working environment. Strengthen business study, improve their comprehensive quality and business level, fundamentally improve the level of storage and reduce the cost of storage and maintenance. I will continue to maintain positive work enthusiasm and clear working ideas, keep my feet on the ground and make persistent efforts.

In the future work, I will strive to innovate on the existing professional and technical level, absorb advanced experience while giving full play to my own advantages, and give full play to my light and heat for the development of Zhuoxin's landscaping.

Summary of Garden Annual Work 3 Dear Owners:

On the occasion of the Spring Festival, Meijing Garden Co., Ltd. would like to extend sincere greetings to the owners of Pearl River Garden and wish everyone a happy life in the new year! Take off Huang Da! Peace and happiness!

Established in 20xx, Meijing Garden Co., Ltd. takes the concept of service first and customer first as its life, and their healthy growth is our greatest wish. After six years of development, the company has made rapid progress in technology, equipment and talents. We have been working hard in Shangri-La Hotel, Haibitai, Century Home, Yanshan Home, Yanda High School, Gulf Company and other units.

Taking this opportunity, I also hope that the majority of owners can cherish and cherish every weak life, don't trample on them, don't destroy them, as long as you take two more steps around, these two steps are the embodiment of your literacy! These two steps are the embodiment of your love! Are these two steps really that long?

General situation of greening in Zhujiang Garden Community Project: the greening area is 55,000 square meters, with 6,000 tall trees, flowering shrubs12,000 plants, hedges16,500 square meters, perennial flowers19,250 square meters, and lawn area of 22,000 square meters.

The greening work of our company began on March 3, 20051day. First, clear the cold-proof materials, cut down and transport the dead trees, prune flowers, shrubs and fruit trees in spring, water them with green water, and then replant the flower ground cover in the community. Due to the economic disputes between real estate and palm garden, the maintenance of 14 community is much less than that of the previous two years, and the prevention and control of overwintering pests and diseases in 14 is not in place, resulting in serious pest breeding in 15 in summer. After timely remedy, our company has been controlled. According to this situation, 15 winter overwintering whitewashing (pest control) has been done very carefully.

15 replant 520 square meters of ground cover flowers, and plant ornamental flowers, aquatic iris and water lilies 170 pots in the pond; Due to the unsatisfactory effect of trampling on greening, the lawn replanting area 1000 square meters.

Pearl River Garden is a high-quality residential area in Qinhuangdao. A large number of large trees have been planted in the green landscape of the community, which makes our greening and maintenance work more difficult. But we know that the garden landscape is the soul of the Pearl River Garden, and our company will go all out, do its duty, and devote all its technical strength to make every weak life grow healthily. How could such a beautiful garden be destroyed in our hands? Please believe us! !

16 continue to strengthen the maintenance of big trees, strive to restore their lush growth in less than two years, strengthen the maintenance and management of big trees and fruit trees newly planted for less than three years, and strive for the lush growth of all trees planted in the community. For some seedlings introduced from other places in the green space of residential areas, if domestication and planting in the local area are unsuccessful, the growth potential is weak and it is difficult to continue to grow, they should be uprooted and tree species should be updated to maintain the overall landscape effect. Because the soil layer is thin and the water retention capacity is weak, it will increase the number of greening maintenance personnel and increase the amount of irrigation and watering. Update the famous trees in the community, install signs of caring for flowers and plants in the grass, and install them in some places that are easy to be trampled by pedestrians.

Please take care of the flowers and trees in the community again! ! !

In addition: our company quit the family plant wall, please enjoy!