When is the winter construction period in Xining, Qinghai?

When the average day and night temperature of the construction site is lower than -5℃ or the lowest temperature is lower than 0℃ for five consecutive days, winter construction measures should be taken.

Heating in Xining City, Qinghai Province generally starts from 10 to 15 and stops in April of the following year. Therefore, the winter construction period in Xining City, Qinghai Province should be from June 10 to April 15 the following year.

brief introduction

In winter construction, some work can't be carried out because of the temperature drop, so measures can be taken when construction is needed. For this reason, the country has issued the Code for Winter Construction of Building Engineering (JJ104-2011).

Winter construction generally refers to entering winter construction when the average daily temperature is lower than five degrees for five consecutive days; There is usually a winter construction period of five to six months in the northeast, which is about1from mid-October to mid-April.

According to the meteorological data in the building construction manual, the winter construction period in Harbin is10.18-4.14, Mudanjiang is10.16-4.13, and Qiqihar and Jiamusi are similar. As for the winter shutdown, it depends on the specific situation of the project. It usually takes about three months. If it is indoors, it will be shorter, a month or two.