Traditional Culture Encyclopedia - Weather inquiry - Matters needing attention and measures in winter construction

Matters needing attention and measures in winter construction

Matters needing attention and measures in winter construction: personnel safety, cold and warmth, equipment management and material storage.

1, personnel safety

Strengthen the safety education of construction personnel under special weather conditions in winter, especially in bad weather conditions such as fog, wind, rain and snow and when working at night. It is strictly prohibited to forcibly organize construction work in bad weather such as rain, snow, windy and foggy weather.

2, cold and warm

Ensure that temporary dormitories, offices and other places on the construction site have good thermal insulation facilities to prevent frostbite accidents. Provide necessary warm clothes and protective articles, such as gloves, hats, scarves, etc. , for the use of construction personnel.

3. Equipment management

Check and maintain the construction equipment before winter to ensure the normal operation of the equipment in low temperature environment. Before starting the equipment, it should be preheated to avoid damage to the equipment caused by low temperature start.

Safety tips for winter construction

1. Anti-skid facilities, such as safety fences and protective nets, should be set up at the construction site.

2. Clean up the snow and ice on the construction site in time to avoid personal injury caused by wet ground.

3. Construction personnel wear non-slip shoes to improve walking stability.

4. Provide necessary warm clothes and protective articles for construction personnel, such as gloves, hats and scarves.

5. Ensure that temporary dormitories, offices and other places on the construction site have good thermal insulation facilities to prevent frostbite accidents.

6. Check and maintain the construction equipment before winter to ensure the normal operation of the equipment in a low temperature environment.

7, equipment should be preheated before start-up, to avoid damage to equipment due to low temperature start-up.

8, strengthen the safety management of the construction site, for aerial work, hoisting and other dangerous projects, corresponding safety measures should be taken.