Traditional Culture Encyclopedia - Weather inquiry - What will happen to the open caisson construction of the river-crossing bridge?
What will happen to the open caisson construction of the river-crossing bridge?
The most common problems in open caisson construction:
1, the rock height difference is too large;
2. When encountering a large boulder, it is very hard and cannot be dug and shot;
3. There is a great difference in the hardness of the rocks inside the open caisson, which makes the open caisson naturally inclined and difficult to correct;
4. Pay attention to the strength of the open caisson foot, which is easy to crack;
5. The self-weight of open caisson is too light, and the friction of surrounding soil is too large, which makes it difficult to sink;
6, open caisson in the process of sinking, it is easy to produce axis deviation, pay attention to rectification.
- Previous article:What are the three bends in the weather forecast?
- Next article:Is Gregorian calendar weather a virus software?
- Related articles
- Why is the weather temperature high in Guangxi?
- How to reduce the noise when the electric fan is too noisy?
- How to write a travel note of about 400 words?
- Beautiful sentences describing maple leaf red.
- What are the poems describing Japan?
- It is said that the Spring Festival is the collective memory of China people. What are the places in your hometown full of Spring Festival memories?
- How to test the weather?
- The weather forecast of mobile phone shows that the network is unavailable.
- There is a poem about being far apart. What is this?
- Geography teaching plan of climate characteristics