Traditional Culture Encyclopedia - Hotel franchise - March 1 1

March 1 1

According to the statistics of Wenzhou Housing Management Bureau, Cangnan County sold two suites on March 1 1 day, 2022, including one residence and one apartment hotel. Let's take a look at the related transactions between residential buildings and apartment hotels!

The house sold in Cangnan is Shi Sheng Mingmen Home (Phase I). The project is located in the south of Huancheng South Road in Lingxi Town, west of Gongyuan Road and east of Yanshan Road (plot B-02 in Jiangnan New District). The pre-sale permit number of the commodity house is Cangshou Xu Zi (2020) No.001,which was built by Cangnan Han Hong Real Estate Co., Ltd.

The total construction area of this project is 100956.38㎡, of which the above-ground construction area is 85,659.09 ㎡ (including residential area of 84,347.37 ㎡, property house of 678.6㎡, home pension house 17 1.83㎡, garbage house of 20㎡, and power distribution room). There are 770 residential buildings in this project, with a total number of 10 buildings, namely 1 0 building, 2 building, 3 building, 4 building, 5 building, 6 building, 7 building, 8 building, 9 building and 10 building, in which the fourth building is a supporting building.

The total construction area of the third and fifth sets of commercial houses in the project is14434.12m2, *** 130 sets (of which three sets of 20 1 rooms are model houses for customers to visit and show, which are not included in the pre-sale scope of this batch). The construction area of the commercial house applying for pre-sale this time is 14324. 1 1 m2 (residential), *** 129 sets. In which: Building No.3, residence:11288.49m2, * * *10/set. Building No.5, residence: 3035.62㎡, ***28 sets.

The house for sale in Cangnan is Haixi Beautiful Shajing Garden (Phase I), and the project is located in Wangsun Village (Yuxi Complex) in mazhan town. The pre-sale permit number of commercial housing is Cangshou Xu Zi (2020) No.028, which was built by Wenzhou Peng Jie Yacht Industry Development Co., Ltd.

This project started on 20 19, 1 1. At present, the main project of 1 ~ 5 building has been completely capped, completed and accepted on September 30, 2022, and delivered to use on February 3, 2022. The construction land area of this project is 43,959.57 ㎡, with a total construction area of 37,657 ㎡, of which the aboveground construction area is 30,767 ㎡ (1/self-sustaining hotel in Building No.8 is 8004 ㎡, and other hotels in Building No.2 are 22,763 ㎡), and the underground construction area is 6890㎡ (860).

The total construction area of this project is 37,446.11㎡, of which the construction area is 30,679.74 ㎡ (guest room 2393 1. 1 set, hotel 6530.92㎡, property 138). Exhaust and smoke extraction wells, etc. Both are 21.84m2), excluding the construction area of 6766.37m2 (motor vehicle garage 5741.28m2, power distribution room 287.02m2, water pump room 70.1㎡ and generator room 667.96m2).